Last Updated For Projects Advertised Through: 09/30/15
Document
  
  
  
  
  
  
  
900.605CFUnderwater GroutPrepackaged single component Portland cement containing aggregates with anti washout components for placement underwater by the tremie methodMount Holly/Ferrisburgh STRB 1501/STRB 15028/12/2015
900.608CM, CYAggregate Surface CourseRemoving, stockpiling, re-using existing, and supplementing with new aggregate surface courseProctor-Middlebury STP WCRS(7)5/5/2010
900.608CM, CYAggregate Surface Course, Colored StoneFurnishing and placing colored stone aggregate surface courseBrandon NH 019-3(495)9/23/2009
900.608CM, CYAggregate Surface Course, Sidewalk/TrailFurnishing and placing aggregate surface wearing course on sidewalks/trailsHardwick RREW12U8/26/2015
900.608CM, CYBridge Railing, F-Shape ConcreteCast-in-place concrete bridge railing (F-shape)Guilford AC IM 091-1(33)6/25/2008
900.608CM, CYCedar Bark MulchFurnishing and stockpiling cedar bark mulch for use in planting bedsBarre City FEGC F 026-1(34)C/24/6/2011
900.608CM, CYChoker Course, Porous PavementAlternate porous pavement structureUsed under Category II Experimental Work PlanRandolph CMG PARK(21)S8/22/2007
900.608CM, CYClay BorrowConstructing a wetland berm with specified materialMorristown STP F 029-1(2)2/13/2013
900.608CM, CYCoarse Aggregate BackfillFurnishing and placing backfill adjacent to underdrain trenchNew Haven RREW001B12/18/2014
900.608CM, CYCompressible FillAlternate substructure backfill materialRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.608CM, CYCoring ConcreteCoring existing substructure concrete for placement of new utility encasementsItem used for multiple similar applicationsJohnson BHO 1448(29)3/11/2009
900.608CM, CYCrushed Stone, 3/4" (FPQ)Furnishing and placing crushed stone, 3/4” underneath the mat foundation and wingwall footingsLunenburg NH CULV(27)8/26/2015
900.608CM, CYCU Structural SoilFurnishing and placing structural soilUsed under Public Interest FindingStatewide STP SDWK(11)10/16/2013
900.608CM, CYDrainage AggregateFurnishing and placing drainage aggregatePutney CMG PARK(26)10/16/2013
900.608CM, CYExcavation for Lowering RailExcavating and grading railway(s)Castleton BRF 015-2(10)11/5/2014
900.608CM, CYExcavation of Contaminated Soils, Class IIIExcavating and disposing of contaminated soilsRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.608CM, CYExcavation of Petroleum Contaminated Soils, Class IExcavating and disposing of contaminated soilsRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.608CM, CYExcavation of Petroleum Contaminated Soils, Class IIExcavating and disposing of contaminated soilsRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.608CM, CYGabion MattressFurnishing and placing a protective gabion mattress for roadway stabilizationEssex STP 2912(2)7/1/2015
900.608CM, CYGeogrid-Compressible InclusionAlternate substructure backfill materialWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.608CM, CYGranular Backfill for StructuresFurnishing and placing granular backfill for structures with testing for compactionHubbardton ER STP 0161(26)/ER STP 0161(27)8/15/2012
900.608CM, CYGranular BorrowFurnishing and placing granular borrow in embankmentsGranville ER STP 013-4(40)7/15/2015
900.608CM, CYGrout BagsFor underwater repairs to concrete substructuresAndover BHF 016-1 (29)2/18/2015
900.608CM, CYHigh Performance Concrete, Class A High StrengthModified HPC for bridge substructureJamaica ER BRF 013-1(16)10/31/2012
900.608CM, CYHigh Performance Concrete, Class A Low CementModified HPC for bridge superstructureHartland BHF BPNT(12)1/15/2014
900.608CM, CYHigh Performance Concrete, Class AA Low CementModified HPC for bridge superstructure rehabilitationMorristown STP F 029-1(2)C/15/23/2012
900.608CM, CYHigh Performance Concrete, LightweightLightweight HPC for half-filled grid decking constructionPaid under decking itemBridgewater BRS 0149(4)3/17/2010
900.608CM, CYHigh Performance Concrete, Low ShrinkageHPC with shrinkage admixture for bridge railing, curb, and sidewalk concreteUsed under Category II Experimental Work PlanBarton BRO 1449(29)4/4/2007
900.608CM, CYHigh Performance Concrete, Mass PourHPC with modified gradation and/or proportioning for pier footing constructionLincoln BRF 0188(8)1/7/2015
900.608CM, CYHigh Performance Concrete, No Silica FumeModified HPC for bridge superstructureEast Montpelier BRF 028-3(36)2/18/2009
900.608CM, CYHigh Performance Concrete, Rapid SetModified HPC for bridge superstructureWoodstock BRF 0151(21)9/30/2015
900.608CM, CYHydric SoilObtaining and placing hydric soils on a wetland mitigation siteCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.608CM, CYLightweight BackfillAlternate substructure backfill materialCanaan ER ST 0271(16)9/3/2008
900.608CM, CYMechanically Stabilized Earth Abutment Backfill System (FPQ)Fabricating, transporting, and constructing a mechanically stabilized earth (MSE) abutment backfill systemWaitsfield BRF 013-4(39)9/16/2015
900.608CM, CYPermanent Stone Check DamPermanent stone check dam in channel/roadway swaleRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.608CM, CYPipe Joint Repair, RCPRepairing joint(s) in existing reinforced concrete pipeBrandon NH 019-3(495)9/23/2009
900.608CM, CYPipe Ramming, Obstruction RemovalRemoving obstructions for pipe ramming operationsSouth Burlington IM SCRP(3)2/3/2010
900.608CM, CYRailroad BallastFurnishing and installing railroad ballast (see also 900.680)East Wallingford REW4140A9/16/2015
900.608CM, CYRemoval of Ledge Salvage MaterialHandling material from ledge removal operationsTownshend STP 015-1 (22)2/18/2015
900.608CM, CYRemoval of Ledge Waste MaterialHandling material from ledge removal operationsTownshend STP 015-1 (22)2/18/2015
900.608CM, CYRiprap, Channel ArmoringFurnishing and placing riprap material for channel raising and/or armoringWoodstock ER 0241 (40)2/25/2015
900.608CM, CYSelf-Consolidating ConcreteWorkable concrete mix for Texas bridge railing constructionUsed also in substructure rehabilitation applicationsBraintree BRO 1444(36)1/27/2010
900.608CM, CYShotcreteShotcreting faces of rock slopesRockingham RREW12J11/20/2013
900.608CM, CYStone DiaphragmFurnishing and installing stone diaphragm(s) as stormwater treatmentBristol BRF 021-1(29)12/10/2014
900.608CM, CYStone FillFurnishing and placing stone fill material inside of, as well as upstream and/or downstream of, a culvert or pipe to facilitate aquatic organism passage and mimic the native channelJamaica ER STP 013-2 (12)3/11/2015
900.608CM, CYStone Fill, Arch Flow LineStone fill inside concrete arches to facilitate aquatic organism passageShrewsbury STP 1443(44)8/20/2014
900.608CM, CYStone Fill, Channel Flow LineStone fill inside frame/arch-type structure to facilitate aquatic organism passageRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.608CM, CYStone Fill, Culvert LiningStone fill inside box culverts to facilitate aquatic organism passageJamaica ER STP 013-2 (12)3/11/2015
900.608CM, CYStone Fill, Stream Bed MaterialFurnishing and placing stone fill to mimic native channelWardsboro-Jamaica ER STP 013-1(17)/BF 013-1(21)(22)4/2/2014
900.608CM, CYSubbase, Porous PavementAlternate porous pavement structureUsed under Category II Experimental Work PlanRandolph CMG PARK(21)S8/22/2007
900.608CM, CYTemporary Railroad BallastFurnishing, installing, and removing temporary railroad ballast in order to access the project site.East Wallingford REW4140A9/16/2015
900.608CM, CYTemporary Reservoir Outlet ProtectionTemporary outlet protection deviceBennington AC NH 019-1(52)2/13/2008
900.608CM, CYTrenchless Pipe Obstruction RemovalRemoving obstructions for trenchless constructionNew Haven/Ferrisburgh RREW001A/C/D3/4/2015
900.608CM, CYTrim Blasting, Truck MeasurementRemoving ledge on rock slopesTownshend STP 015-1 (22)2/18/2015
900.608CM, CYUltra High Performance Concrete (FPQ)Furnish all materials, tools and labor necessary for the performance of all work to form, cast, cure & finish Ultra High Performance Concrete (UHPC)Waitsfield BRF 013-4(39)9/16/2015
900.608CM, CYUnclassified Excavation of Contaminated SoilsExcavating, classifying, segregating, and stockpiling contaminated soilsBarre City FEGC F 026-1(34)C/15/5/2010
900.608CM, CYUpland Manufactured SoilsFurnishing and blending manufactured topsoil for upland habitatCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.608CM, CYWetland Manufactured SoilsFurnishing and blending manufactured topsoil for wetland habitatCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.610DAYExploratory BoringsPerforming exploratory borings to confirm bedrock ledge elevationRockingham STP GMRC(1)11/10/2010
900.615DOLLARErosion Prevention and Sediment Control MeasuresAlternate EPSC protocol for non-jurisdictional and low risk projectsN.A.B.I. - To be used under Agency conditional approval onlyWarren ER-STP 013-4(36)11/9/2011
900.615DOLLARMaintenance of EPSC PlanAlternate EPSC protocol for non-jurisdictional and low risk projectsN.A.B.I. - To be used under Agency conditional approval onlyWarren ER-STP 013-4(36)11/9/2011
900.620EACHAccess to BridgeProviding access for performing bridge inspectionStatewide BRO INSP(12)6/24/2015
900.620EACHAdjust Elevation of Pull BoxAdjusting elevation of pull box(es)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHAdjust Elevation of Valve BoxAdjusting elevation of valve box(es)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHAdjust Elevation of Water Shut-OffAdjusting elevation of water shut-off(s)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHAdjust Side Inlet Catch BasinAdjustment to grade of a catch basin inlet grate using a cast iron riserSt. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHAir Release ManholeFurnishing and installing air release manholeHartford IM BLDG(10)6/4/2008
900.620EACHAmphitheaterConstructing an amphitheaterAddison STP 032-1(18)8/15/2012
900.620EACHATC, INSYNCFurnishing and installing Adaptive Traffic Control (ADT) systemUsed under Category II Experimental Work PlanWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.620EACHBallasted Turnouts, InsulatedFurnishing and installing insulated ballasted turnoutsPittsford STP 2033(21)6/12/2013
900.620EACHBallasted Turnouts, Non-InsulatedFurnishing and installing non-insulated ballated turnoutsProctor-Middlebury STP WCRS(7)5/5/2010
900.620EACHBat HouseConstructing and installing a bat houseAddison STP 032-1(18)8/15/2012
900.620EACHBearing Device Assembly, Covered BridgeBearing devices on covered bridgeWoodstock BHO 1444(52)8/8/2012
900.620EACHBearing Device Assembly, Floating BridgeBearing devices on floating bridgeBrookfield BRF FLBR(2)1/8/2014
900.620EACHBearing Device Assembly, Preformed Fabric PadFurnishing and installing fabric bearing devices on a covered bridgeMiddlebury WCRS(9)6/24/2015
900.620EACHBicycle RackFurnishing and installing a bicycle rackSpringfield CMG PARK(32)7/23/2014
900.620EACHBlock FlocculantSediment control deviceBennington AC NH 019-1(54)3/24/2010
900.620EACHBluebird Box and PostConstructing nesting box with postCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHBonded Insulated JointsFurnishing and installing bonded insulated jointsBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHBridge Railing Concrete Transition BarrierFurnishing and erecting concrete transition barrier for bridge railingPlymouth ER BRS 0149(5)10/17/2012
900.620EACHBuried Cable PedestalInstalling utility-furnished cable pedestalDanville FEGC 028-3(32)2/23/2011
900.620EACHButterfly Valve with Valve BoxFurnishing and installing butterfly valveBarre City BHF 6000(15)S2/25/2009
900.620EACHCap Curb Drop InletCapping exisiting curb drop inletRandolph STP 2932(1)6/25/2014
900.620EACHCast Iron Grate With Frame, ConcaveFurnishing and placing cast iron grate with frameGuilford-Brattleboro STP 2707(1)9/15/2010
900.620EACHCleanout ManholeFurnishing and installing cleanout manholeHartford IM BLDG(10)6/4/2008
900.620EACHCommemoration PierInstalling a commemoration pierAddison STP 032-1(18)8/15/2012
900.620EACHCompromise JointsFurnishing and installing compromise rail joint assembliesBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHConcrete Outlet Structure with Cast Iron GrateFurnishing and installing a precast concrete outlet structure with cast iron grateMorristown STP F 029-1(2)2/13/2013
900.620EACHCoring ConcreteCoring into existing drainage structure and mortaring new underdrain placed in structureBethel-Randolph STP 2921(1)5/27/2015
900.620EACHCPM ScheduleDeveloping and furnishing a Critical Path Method (CPM) schedule for the duration of the contractWoodstock BRF 0151(21)9/30/2015
900.620EACHCut Habitat TreeProviding cut trees with limbs intact for wildlife habitatCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHCVPS Phase 1 TransformerInstalling utility-furnished transformerDanville FEGC 028-3(32)2/23/2011
900.620EACHCVPS Phase 3 VaultInstalling utility-furnished vaultDanville FEGC 028-3(32)2/23/2011
900.620EACHDecommission Curb Drop InletAbandonment of existing curb drop inletWestfield-Troy STP 2903(1)6/10/2015
900.620EACHDecommission Observation WellDecommissioning existing wellBennington AC NH 019-1(51)4/15/2009
900.620EACHDecommission Water WellDecommissioning existing wellGuilford IM-IR 091-1(25)9/4/2013
900.620EACHDilemma Zone/Video Vehicle Detection SystemFurnishing and installing dilemma zone/video vehicle detection systemCharlotte-South Burlington NH 2907(1)5/23/2012
900.620EACHDockDesigning, furnishing, and constructing a dock and its accessAddison STP 032-1(18)8/15/2012
900.620EACHDynamic Cone Penetration TestPre-injection testing for pavement stabilizationSpecialty work performed under Category II Experimental Work PlanHartford IM 089-1(60)8/21/2013
900.620EACHEarth Pressure CellGeotechnical instrumentation (earth pressure cell)Cabot BRO 1446(27)1/9/2008
900.620EACHElectric Power Board and CabinetFurnishing and installing an electric power board and cabinet (see also 900.645)Bristol HES 021-1(28)(Re-Advertised)7/23/2014
900.620EACHElectric Vehicle OutletFurnishing and installing an electric vehicle (EV) outletSpringfield CMG PARK(32)7/23/2014
900.620EACHFiber Optic Acceptance TestingPerforming fiber optic acceptance testingHartford-Sharon FITS(503)10/20/2010
900.620EACHFiber Optic Cable Route MarkerFurnishing and installing cable route marker (CRM) posts along fiber optic cable routeWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.620EACHField Drilling Holes in Structural SteelDrilling holes in existing painted steel bridge stiffener platesHartford-Sharon FITS(503)10/20/2010
900.620EACHFlashing Beacon Signal Heads, LEDRemoving existing flashing beacon signal heads, furnishing and installing light-emitting diode (LED) flashing beacon signal heads, including mounting equipment and signal cableSt. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHFoundation for W-Shape Steel Post, 24 Inch DiameterNon-standard foundation configurationHartford-Royalton IMG SIGN(48)9/23/2015
900.620EACHFoundation for W-Shape Steel Post, 30 Inch DiameterNon-standard foundation configurationHartford-Royalton IMG SIGN(48)9/23/2015
900.620EACHFrost-Free ManholeConstructing frost-free manholeDanville FEGC 028-3(32)2/23/2011
900.620EACHFurnish and Install Bolt SetsFurnishing and installing bolt sets in railroad track connectionsRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.620EACHFurnish and Install HandholeFurnishing and installing handhole for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.620EACHFurnish and Install Joint BarsRemoving defective and furnishing and installing new joint bars for railroad track construcitonRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.620EACHFurnish and Install Splice Vault and HandholeFurnishing and installing splice vault and handhole for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.620EACHFurnish and Install Tie PlatesRemoving defective and furnishing and installing new tie plates for railroad track construcitonRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.620EACHFusion Splice Fiber Optic Cable End SplicePerforming cable end-to-end fiber fusion splicing for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.620EACHGate Valve with Valve BoxFurnishing and installing gate valve(s) with valve box(es)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHGNSS Construction Inspection EquipmentFurnishing, installing, and removing Global Navigation Satellite System (GNSS) unitsPavement reclaiming projectsBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHGrade Control WeirFurnishing and constructing grade control weirCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHGranite BollardFurnishing and installing granite bollard(s)Brookfield BRF FLBR(2)1/8/2014
900.620EACHGranite PostFurnishing and installing granite post as artistic enhancement in village centerDanville FEGC 028-3(32)2/23/2011
900.620EACHGranite Post and Chain FenceFurnishing and installing granite post and chain fenceBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHGrass Outlet Sediment TrapAlternate sediment control measureBennington AC NH 019-1(51)4/15/2009
900.620EACHGravel BagsGravel bags for drainage inlet protectionClarendon BHO 1443(39)7/29/2009
900.620EACHGrid Crack GaugeFurnishing and installing grid crack gauge to monitor crack/joint displacementSouth Burlington-Colchester IM CULV(23)3/30/2011
900.620EACHGround Monitoring PointFurnishing and installing ground monitoring point to monitor vertical movementSouth Burlington-Colchester IM CULV(23)3/30/2011
900.620EACHGuardrail Approach Section to Concrete Bridge RailingApproach to alternate bridge railing configurationReadsboro BRF 0105(3)4/4/2012
900.620EACHGuardrail Approach Section to Concrete Combination Bridge RailingApproach to alternate bridge railing configurationRoyalton BRS 0147(13)9/25/2013
900.620EACHGuardrail Approach Section to Concrete Median BarrierApproach to alternate bridge railing configurationRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.620EACHGuardrail Approach Section to F-Shape Concrete RailApproach to alternate bridge railing configurationGuilford AC IM 091-1(33)6/25/2008
900.620EACHGuardrail Approach Section, Galvanized 2 Rail Box BeamApproach to alternate bridge railing configurationRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.620EACHGuardrail Approach Section, Galvanized 3 Rail Box BeamApproach to alternate bridge railing configurationRoxbury BHF 0187(8)/ER 0187(9)9/23/2011
900.620EACHGuardrail Approach Section, Galvanized HD Steel Beam w/8 FT PostsFurnishing and erecting galvanized HD steel beam guardrail approach sections with long postsMontgomery BHO 1448(27)12/18/2013
900.620EACHGuardrail Approach Section, TrussFurnishing and erecting guardrail approach sections to an existing steel pony truss bridgeHartford (Wilder) STP 1444(35)7/14/2010
900.620EACHGuardrail Approach Section, Weathering Type IIWeathering steel approach sectionBarnard BHO 1444(40)11/19/2008
900.620EACHHydrotracker SensorFurnishing and installing moisture sensors on concrete bridge deck(s)Specialty work performed under Category II Experimental Work PlanWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.620EACHImpact Displacement Pier Modulus Load TestLoad testing impact displacement pierSpecialty work performed under Category II Experimental Work PlanCornwall BRS 0172(6)3/24/2010
900.620EACHInclinometerFurnishing and installing inclinometer to monitor horizontal ground displacementsSouth Burlington-Colchester IM CULV(23)3/30/2011
900.620EACHInformational Sign with Stand-off Sign HoldersFurnishing stand-off sign holders and installing signAddison STP 032-1(18)8/15/2012
900.620EACHInformational Sign with Steel PostsFurnishing and erecting informational sign posts and installing signAddison STP 032-1(18)8/15/2012
900.620EACHInlet Protection Device, Filter FiberAlternate inlet protection deviceCorinth BRO 1447(29)9/10/2014
900.620EACHInlet Protection, Geotextile FabricAlternate inlet protection deviceStatewide STP SDWK(11)10/16/2013
900.620EACHInlet Protection, Steel PlateAlternate inlet protection deviceBennington AC NH 019-1(53)5/30/2007
900.620EACHInstall Bearing Device AssemblyInstalling Agency-supplied bearing device assembliesRichmond BHF 0209(6)1/28/2009
900.620EACHInstrument DecommissioningDecommissioning geotechnical instrument at a siteSouth Burlington-Colchester IM CULV(23)3/30/2011
900.620EACHInsulated JointsFurnishing and installing insulated jointsRutland-Burlington VTRY(3)5/21/2014
900.620EACHIntake GrateFurnishing and installing an intake grate and pipe increaserCornwall BRS 0172(6)3/24/2010
900.620EACHJ VaultInstalling utility-furnished vaultDanville FEGC 028-3(32)2/23/2011
900.620EACHLED Blank Out SignsFurnishing and installing LED blank out signsRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHLight Pole, Type DFurnishing and installing light pole for street light assemblyRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHLighting Control PanelFurnishing, installing, and testing street lighting control panelBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHLuminaire, LEDFurnishing and installing light emitting diode (LED) luninaire fixturesWaterbury STP WKZN(9) C/211/19/2014
900.620EACHLuminaire, LED RetrofitHyde Park HES 030-2(23)6/3/2015
900.620EACHManufactured Terminal Section, Flared/WeatheringWeathering steel MTSMiddlebury STP 2627(1)/Ripton-Hancock STP 2803(1)1/27/2010
900.620EACHManufactured Terminal Section, Tangent/WeatheringWeathering steel MTSMiddlebury STP 2627(1)/Ripton-Hancock STP 2803(1)1/27/2010
900.620EACHMeter PedestalInstalling utility-furnished meter pedestalDanville FEGC 028-3(32)2/23/2011
900.620EACHMicropileFurnishing and installing micropilesBennington ER BHF 010-1(45)10/3/2012
900.620EACHMicropile Verification Load TestVerification load test for micropile installationBennington ER BHF 010-1 (45)10/3/2012
900.620EACHModified Settlement PlatformGeotechnical instrumentation (for pier settlement monitoring)Bennington AC NH 019-1(53)5/30/2007
900.620EACHModify Existing Pedestrian Signal System, IntersectionModifying an existing intersection pedestrian signal systemBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHMonitoring Gauge BoulderObtaining and placing boulder to monitor water surface elevationsCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHOff-line Particle SeparatorFurnishing and installing off-line particle separator for stormwater treatmentBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHOptical Speed BarFurnishing and placing retroreflective optical speed bar pavement markingsStatewide - Northwest Region STP HRRR(9)8/24/2011
900.620EACHOrnamental Street LightFurnishing and installing ornamental street light and appurtenancesJericho STP FTBR(3)5/7/2014
900.620EACHOutside Drop for Sewer ManholeConstructing sanitary sewer manhole(s)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHOverflow Control StructureFurnishing and installing wet pond overflow control structureBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHParking MeterRemoving existing parking meter(s) and post(s), furnishing and installing new parking meter(s) and post(s), and removing and resetting existing parking meter(s)St. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHParking Meter PostFurnishing and installing new parking meter post(s)St. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHParking MetersFurnishing and installing new parking meter(s)St. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHPedestal Mounted Pedestrian Signal HeadFurnishing and installing pedestal mounted pedestrian signal headADA push buttons and audible signalsHartford-Norwich/Norwich paving (4 projects)5/6/2009
900.620EACHPedestal Mounted Pedestrian Signal Head, CountdownFurnishing and installing pedestal mounted pedestrian signal headsStatewide - NW Region STP HRRR(17)2/19/2014
900.620EACHPedestrian Signal Heads, CountdownRemoving existing and furnishing and installing new pedestrian signal headsChester-Springfield-Rockingham-Windsor STP 2952(1)4/22/2015
900.620EACHPier Survey TargetGeotechnical instrumentation (for pier settlement monitoring)Bennington AC NH 019-1(53)5/30/2007
900.620EACHPiezometer, Vibrating WireGeotechnical instrumentation (for embankment settlement monitoring )Cornwall BRS 0172(6)3/24/2010
900.620EACHPipe Slope DrainInstalling and removing pipe slope drainsBennington AC NH 019-1(54)3/24/2010
900.620EACHPorch SupportRemoving and replacing existing porch supportDanville FEGC 028-3(32)2/23/2011
900.620EACHPrecast Approach Slab, Super SlabFurnishing and installing Super-Slab™ system at approach slab locationsUsed under Category II Experimental Work PlanChester BRF 025-1(28)/BRF 025-1(37)10/13/2010
900.620EACHPrecast Concrete Diversion Catch Basin with Cast Iron GrateAlternate catch basin designBarre Town HES 026-1(38)2/20/2008
900.620EACHPrecast Concrete Retention StructureFurnishing and installing a precast concrete retention structureRandolph CMG PARK(21)S8/22/2007
900.620EACHPrecast Reinforced Concrete Catch Basin with Cast Iron GrateFurnishing and installing a precast reinforced concrete perforated catch basin with cast iron grateColchester STP 5600 (12)2/4/2015
900.620EACHPrecast Reinforced Concrete Manhole with Cast Iron Cover and Diversion WeirFurnishing and installing a PRC manhole with cast iron cover and diversion weirBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHPrefabricated Vertical Wick Drain MobilizationMobilizing for prefabricated vertical wick drain installationCornwall BRS 0172(6)3/24/2010
900.620EACHRadar Speed Feedback Sign Assembly with Flashing Beacons, AC-PoweredInstalling radar speed feedback sign assmebly(ies)Statewide STP SRIN(25)1/30/2013
900.620EACHRadar Speed Feedback Sign Assembly with Flashing Beacons, Solar-PoweredInstalling radar speed feedback sign assmebly(ies)Statewide STP SRIN(25)1/30/2013
900.620EACHRadar Speed Feedback Sign Assembly, AC-PoweredInstalling radar speed feedback sign assmebly(ies)Statewide STP SRIN(25)1/30/2013
900.620EACHRadar Speed Feedback Sign Assembly, Solar-PoweredInstalling radar speed feedback sign assmebly(ies)Statewide STP SRIN(42)5/6/2015
900.620EACHRadar Stop Bar Detection SystemFurnishing and installing radar stop bar detection equipment for existing traffic control signal systemCharlotte-South Burlington NH 2907(1)5/23/2012
900.620EACHRadio Interconnect/Video Vehicle Detection SystemFurnishing and installing vehicle detection system and wireless radio interconnect equipmentBrattleboro STPG SGNL(36)8/5/2009
900.620EACHRailroad Signal CabinetFurnishing and installing a railroad signal cabinetRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHRaise, Align, and Surface TurnoutRaising, aligning, and surfacing turnout(s) for railroad track constructionRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.620EACHRefurbish Existing Bearing Device AssemblyRefurbishing (cleaning, metalizing, and greasing) existing bearing device assembliesBerkshire BHF 0283(9)S12/23/2009
900.620EACHRelocate Flashing Beacon, Ground MountedRelocating flashing beacon and appurtenances, including sign(s)St. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHRelocate HydrantRelocating existing fire hydrantRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHRelocate Luminaire and Bracket ArmRelocating existing luminaire and bracket armWaterbury STP WKZN(9) C/211/19/2014
900.620EACHRelocate SignRelocating sign(s) and appurtenances, including post(s) and lightingJericho STP FTBR(3)5/7/2014
900.620EACHRemoval and Disposal of Existing PayphoneRemoving and disposing of an existing payphoneRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.620EACHRemoval and Replacement of Bridge TiesRailroad cross tie work within rail bridge limitsChester STP GMRC(4)12/29/2010
900.620EACHRemoval and Replacement of Cross TiesRailroad cross tie work outside of (new) rail-highway crossing (or rail bridge) limitsBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHRemoval and Replacement of Existing Flushing Basin in PavementRemoving and replacing an existing flushing basin in pavementRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.620EACHRemoval and Replacement of Timber TiesRailroad timber tie work outside of (new) rail-highway crossing (or rail bridge) limitsRutland-Burlington VTRY(3)5/21/2014
900.620EACHRemoval and Replacement of TurnoutRemoving and replacing existing turnout with new welded turnout and switch timber packageRutland-Burlington VTRY(3)5/21/2014
900.620EACHRemoval of Existing Area Lighting SystemRemoving and disposing of or salvaging an existing area lighting systemRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.620EACHRemoval of Existing TurnoutRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.620EACHRemoval of Raised Pavement MarkersRemoving and disposing of existing raised pavement marker(s)Waterbury-Richmond IM SURF(33)7/11/2012
900.620EACHRemoval of Tubular MarkerRemoving and handling existing tubular markerBurlington City/Winooski paving (3 projects)4/22/2009
900.620EACHRemove and Replace Existing Bridge Railing PostRehabilitating existing 3 rail box beam bridge railingMilton-Highgate IM MEMB(26)6/1/2011
900.620EACHRemove and Replace Existing Bridge Railing SpindlesRehabilitating existing metal bridge railingBridgewater-Chester-Thetford ST BPNT(2)7/16/2008
900.620EACHRemove and Replace Existing Shear ConnectorsRemoving and replacing existing shear connectorsSuperstructure rehabilitation projectsBerlin AC IM 089-1(20)1/2/2008
900.620EACHRemove and Replace Flashing Beacon, Aerial MountedRemoving and replacing existing flashing beaconEnosburg-Richford STP 2939(1)4/16/2014
900.620EACHRemove and Replace Traffic Signal ControllerRemoving and replacing controller in existing traffic control signal systemAlburgh NH SURF(35)/Alburgh-Colchester STP SURF(36)5/22/2013
900.620EACHRemove and Replace Traffic Signal Controller and CabinetRemoving and replacing controller and cabinet in existing traffic control signal systemColchester-Essex STPG SGNL (45)1/28/2015
900.620EACHRemove and Reset Commercial SignRemoving and resetting commercial sign(s)Barre City FEGC F 026-1(34)C/24/6/2011
900.620EACHRemove and Reset Commercial Sign with Wood PlanterRemoving and resetting commercial signs(s) with wood plantersBrandon NH 019-3(495)9/23/2009
900.620EACHRemove and Reset Existing Bridge Railing PostRemoving and resetting existing bridge railing post(s)St. Johnsbury IM MEMB(27)/BHF MEMB(28)9/14/2011
900.620EACHRemove and Reset Flag PoleRemoving and resetting existing flag poleBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHRemove and Reset Parking MeterRemoving and resetting existing parking metersSt. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHRemove and Reset Sign FoundationRemoving and resetting existing sign foundation(s)Barre City FEGC F 026-1(34)C/15/5/2010
900.620EACHRemove and Reset USPS MailboxRemoving and resetting existing United States Postal Service (USPS) mailbox(es)Barre City FEGC F 026-1(34)C/24/6/2011
900.620EACHRemove and Transport BuildingRemoval and transportation of a buildingAddison STP 032-1(18)8/15/2012
900.620EACHRemove Commercial SignRemoving commercial sign(s)Brandon NH 019-3(495)9/23/2009
900.620EACHRemove Existing Electric Power MeterRemoving existing electric power meter(s)Bradford CMG PARK(33)7/2/2014
900.620EACHRemove Existing Light PoleRemoving existing light poleBerlin STPG SGNL(40)11/12/2014
900.620EACHRemove Existing Overhead Light AssemblyRemoving existing overhead light assemblyMontpelier NH 2604(1)S/STP 2618(1)S4/1/2009
900.620EACHRemove Existing Power Drop StanchionRemoving an existing power drop stanchionHartland CMG PARK(25)10/9/2013
900.620EACHRemove Parking MeterRemoving and disposing of existing parking metersSt. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHRemove Parking Meter PostRemove existing parking meter post(s)St. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHRemoving and Resetting Ground/Ornamental Light AssemblyRemoving and resetting ground and ornamental light(s)Barre City FEGC F 026-1(34)C/24/6/2011
900.620EACHRemoving Sign PostsRemoving and disposing of existing sign postsRutland-Proctor STP 2312(1)S3/14/2007
900.620EACHRemoving, Refurbishing, and Resetting Light PostRemoving, refurbishing, and resetting light postSpringfield BHF 016-2(14)4/1/2009
900.620EACHReplace Maunfactured Terminal Section Wood PostFurnishing and installing new manufactured terminal section wood postsHartford-Sharon AC IM 089-1(57)/Sharon-Royalton AC IM 089-1(58)9/8/2010
900.620EACHReplacement of Existing Meter SocketFurnishing and replacing existing meter socketDanville FEGC 028-3(32)2/23/2011
900.620EACHResidential Meter and ValveFurnishing and installing a residential meter and valveBarre Town HES 026-1(38)2/20/2008
900.620EACHRock Anchor TestingTesting rock anchorsRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.620EACHRock WeirFurnishing and constructing a rock weir for box culvert outlet scour controlWinhall STP CULV(22)2/16/2011
900.620EACHRoot Wad RevetmentFurnishing and constructing root wad revetmentCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHRunway End Identifier Lights, ModifyModifying runway end identifier lightsAirport projectsHighgate AIR 04-31832/6/2008
900.620EACHSanitary Manhole, All-InclusiveFurnishing and installing sanitary sewer manholeRutland City BRF 3000(18)3/26/2014
900.620EACHSanitary Sewer ManholeConstructing sanitary sewer manhole(s)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHSchool Zone Flashing Beacon, AC-PoweredInstalling an ac-powered school zone flashing beaconStatewide STP SRIN(25)1/30/2013
900.620EACHSchool Zone Flashing Beacon, Solar-PoweredInstalling a solar-powered school zone flashing beaconStatewide STP SRIN(42)5/6/2015
900.620EACHSediment BasinConstructing sediment basin(s)Bennington AC NH 019-1(54)3/24/2010
900.620EACHSediment TrapConstructing sediment traps(s)Bennington AC NH 019-1(54)3/24/2010
900.620EACHSettlement Platform, Type IGeotechnical instrumentation (for embankment settlement monitoring)Stockbridge BRF 022-1(20)5/12/2010
900.620EACHSettlement Platform, Type IVGeotechnical instrumentation (for surcharge settlement monitoring)Stockbridge BRF 022-1(20)5/12/2010
900.620EACHSewer CleanoutConstructing sanitary sewer manhole(s)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHSewer ManholeFurnishing and installing sewer manholeHartford IM BLDG(10)6/4/2008
900.620EACHSlate Roof RepairsPerforming spot repair(s) to a slate covered bridge roofShrewsbury BHO 1443 (49)1/7/2015
900.620EACHSoil Bearing Slip BaseFurnishing and installing soil bearing slip base with anchor sleeveHartford-Royalton IMG SIGN(48)9/23/2015
900.620EACHSolar-Powered Flashing Beacon Assembly, Weigh StationInstalling a solar-powered flashing beacon assembly at weigh stationGuilford-Rockingham IMG SIGN(44)5/14/2014
900.620EACHStainless Steel ShelfFurnihsing and installing stainless steel shelf for floating bridge constructionBrookfield BRF FLBR(2)1/8/2014
900.620EACHStainless Steel Traffic MirrorFurnishing and installing stainless steel traffic mirrorBethel BRF 022-1(14)6/22/2011
900.620EACHSteel Bench with BackFurnishing and installing steel bench with backBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHSteel Bench without BackFurnishing and installing steel bench without backBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHStormwater Treatment SystemFurnishing and installing a stormwater treatment systemBrandon NH 019-3(495)9/23/2009
900.620EACHStreet Light, Type AFurnishing and installing street light assemblyBristol HES 021-1(28)(Re-Advertised)7/23/2014
900.620EACHStreet Light, Type BFurnishing and installing street light assemblyBristol HES 021-1(28)(Re-Advertised)7/23/2014
900.620EACHStreet Light, Type CFurnishing and installing street light assemblyBristol HES 021-1(28)(Re-Advertised)7/23/2014
900.620EACHStreet LightsFurnishing and installing street light assemblies, complete with lamp, wiring, fuses, and fuse holders internal to the pole handhole, with ground rod installed, grounding connections, (continued in comments)(continued) and all other items necessary to provide a complete and operational systemBristol HES 021-1(28)(Re-Advertised)7/23/2014
900.620EACHStructure Monitoring PointFurnishing and installing structure monitoring point for monitoring vertical movementSouth Burlington-Colchester IM CULV(23)3/30/2011
900.620EACHSurface and Align TurnoutRaising, aligning, and surfacing turnout(s) for railroad track constructionRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHTemporary Sediment BasinConstructing a temporary sediment basinMorristown STP F 029-1(2)2/13/2013
900.620EACHTemporary Threshold LightsFurnishing and installing temporary threshold lightsAirport projectsHighgate AIR 04-31832/6/2008
900.620EACHTemporary Traffic Signal System, PortableFurnishing and installing a temporary traffic control signal systemBridgewater BF MEMB (34)2/11/2015
900.620EACHTest HolesExcavating test holes to expose existing utilitiesWork typically performed under Contract item 204.22Hartford-Sharon FITS(503)10/20/2010
900.620EACHThermite WeldingPerforming thermite welding for railroad track constructionRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHThrough Truss Rivet ReplacementRemoving existing rivets and replacing with high-strength boltsMontpelier BHF 6400(31)12/28/2009
900.620EACHTighten Manufactured Terminal Section Anchor CableAdjusting manufactured terminal section anchor cableHartford-Sharon AC IM 089-1(57)/Sharon-Royalton AC IM 089-1(58)9/8/2010
900.620EACHTimber Arch Bearing ConnectionFurnishing and installing timber arch bearing connection(s) on a covered bridgeWoodstock BHO 1444(52)8/8/2012
900.620EACHTraffic Control Dilemma Zone Detection System, IntersectionFurnishing and installing a dilemma zone detection system for existing signal systemBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHTraffic Control Radio Interconnect Sys., IntersectionFurnishing and installing radio interconnect equipment for existing signal systemSouth Burlington NHG SGNL(30)4/22/2009
900.620EACHTrail GateFurnishing and erecting trail gateStatewide STP SWRT(1)10/16/2013
900.620EACHTrash ReceptacleFurnishing and installing trash receptacleBarre City FEGC F 026-1(34)C/24/6/2011
900.620EACHUtility Support Assembly, SewerFurnishing and installing support hangars for existing sewer main on bridgeRichmond BHF 0209(6)1/28/2009
900.620EACHUtility Support Assembly, WaterFurnishing and installing support hangars for existing water main on bridgeRichmond BHF 0209(6)1/28/2009
900.620EACHVAST Sign Cedar PostFurnishing and placing cedar post(s) for VAST trail signsCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHVehicle Preemption/Video Vehicle Detection SystemFurnishing and installing video vehicle preemption/video vehicle detection systemColchester STPG SGNL(45)1/28/2015
900.620EACHVehicle Signal Heads, LEDRemoving existing signal heads, furnishing and installing light-emitting diode (LED) signal heads, including mounting equipment, signal cable, and electronic signageSt. Johnsbury-Lyndon STP 2936(1)7/30/2014
900.620EACHVehicle Stop Bar Detection SystemFurnishing and installing vehicle stop bar detection systemBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.620EACHVibrating Wire Settlement SystemGeotechnical instrumentation (vibrating wire settlement system)Cabot BRO 1446(27)1/9/2008
900.620EACHVideo Vehicle Detection SystemFurnishing and installing video vehicle detection systemRichmond-Colchester IM SURF(38)(Re-advertised)1/22/2014
900.620EACHWaste Characterization SamplingEnvironmental laboratory characterization of contaminated soilsBennington NH 019-1(55)4/23/2008
900.620EACHWater Main Line StopFurnishing, installing, and setting line stops into existing water mainsRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.620EACHWinter Traffic BarrierFurnishing, installing, and removing traffic barrierBrookfield BRF FLBR(2)1/8/2014
900.620EACHWood Duck Box and PostConstructing nesting box with postCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.620EACHWood Epoxy RepairsRepairing deteriorated portions of existing covered bridge wood membersTownshend STP SCTT(1)8/19/2015
900.620EACHYard HydrantFurnishing and installing a yard hydrantRoundaboutBarre Town HES 026-1(38)2/20/2008
900.625L, GALConcrete Staining and SealingTinted stain and sealant for concrete surfacesTownshend STP SCTT(1)8/19/2015
900.625L, GALEpoxy Injection for Crack SealingSealing cracks in existing concrete substructure elementsThetford BHF 0177(9)3/21/2012
900.625L, GALLiquid Calcium Chloride for Base StabilizationWestfield-Troy STP 2903(1)6/10/2015
900.630HRHand ScalingRemoving ledge on rock slopesTownshend STP 015-1 (22)2/18/2015
900.630HRHigh ScalingRemoving ledge on rock slopesHartford-Newbury IM 091-2(72)8/12/2009
900.630HRLedge RemovalExcavating loose and dilated rock on slopes and reconstructing rock slopes, or segments of rock slopes, at shallower, more stable slope anglesTownshend STP 015-1 (22)2/18/2015
900.630HRMachine ScalingRemoving ledge on rock slopesTownshend STP 015-1 (22)2/18/2015
900.630HRMonitoring EPSC PlanAlternate EPSC protocol for non-jurisdictional and low risk projectsTo be used under Agency conditional approval onlyWarren ER-STP 013-4(36)11/9/2011
900.630HRTrenchless Pipe Obstruction RemovalRemoving obstructions for trenchless constructionSouth Burlington-Colchester IM CULV(23)3/30/2011
900.630HRUnexpected Obstruction DrillingAdvancing new pile construction through unexpected obstruction(s)Woodstock BRF 0151(21)9/30/2015
900.635KG, LBConcrete Pavement Joint Repair, TechcreteRehabilitating existing concrete pavement jointsUsed under Category II Experimental Work PlanBurlington City/Winooski paving (3 projects)4/22/2009
900.635KG, LBEpoxy Coated Reinforcing SteelFurnishing and placing epoxy coated reinforcing steelFor not providing a reinforcing steel schedule in the PlansHartford (Wilder) STP 1444(35)7/14/2010
900.635KG, LBErosion Control/Restoration MixPreparing area and applying wetland seed mixCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.635KG, LBHigh Density Polymer Injection, URETEK 486 STARHigh density injection for pavement stabilizationSpecialty work performed under Category II Experimental Work PlanHartford IM 089-1(60)8/21/2013
900.635KG, LBHigh Performance Steel, Curved Plate Girder, Grade HPS 485W (70W)HPS for structural componentsBristol STP F 021-1(15)6/5/2013
900.635KG, LBInstallation of Steel PilingsDelivering and installing steel pilingsLunenburg NH CULV(27)8/26/2015
900.635KG, LBInstallation of Structural SteelInstallation of pre-purchased structural steel materialUsed as a Final Pay Quantity (FPQ) itemNorth Hero-Grand Isle BHF 028-1(21)10/24/2007
900.635KG, LBIntegral Color Concrete PigmentIncorporating an integral coloring pigment into concreteCavendish RREW12K2/4/2015
900.635KG, LBReinforcing SteelFurnishing and placing reinforcing steelFor not providing a reinforcing steel schedule in the PlansHartford (Wilder) STP 1444(35)7/14/2010
900.635KG, LBStainless Steel ReinforcingAlternate reinforcing for superstructure concreteMorristown STP F 029-1(2)C/15/23/2012
900.635KG, LBStructural Steel, Curved Plate Girder, Grade HPS 70WHPS for structural componentsSpringfield BRO 1442(26)9/21/2011
900.635KG, LBWild Rice SeedPreparing area and applying wetland seed mixCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.635 900.683KG, CWTEmulsified AsphaltFurnishing and applying bituminous treatment on an approved surfaceType RS-1H or CRS-1HLemington-Canaan STP 2723 (1)3/11/2015
900.635 900.683KG, CWTEmulsified Asphalt, Cold Mix with CementFurnishing emulsion for cold mixed recycled bituminous pavementRandolph-Roxbury ER STP 0187(11)12/17/2014
900.635 900.683KG, CWTEmulsified Asphalt, Reclaimed Stabilized BaseFurnishing and applying emulsion seal on reclaimed stabilized baseType CSS-1HBrighton-Warren Gore STP 2724(1)S/Warren Gore-Norton STP 2725(1)S7/8/2009
900.635 900.683KG, CWTFog Seal Surface TreatmentAlternate surface treatmentRandolph-Roxbury ER STP 0187(11)12/17/2014
900.64M, LFTimber Guardrail (Wood Posts)Furnishing and assembling of guardrailTownshend STP SCTT(1)8/19/2015
900.640M, LF15 Inch Underdrain PipeFurnishing and placing underdrain pipe in drain curtainColchester STP 5600 (12)2/4/2015
900.640M, LF150 mm (6 Inch) Underdrain Carrier Pipe, All-InclusiveFurnishing and installing underdrain carrier pipe under all-inclusive (including excavation) paymentDanville FEGC 028-3(32)2/23/2011
900.640M, LF150 mm (6 Inch) Underdrain Pipe, All-InclusiveFurnishing and installing underdrain pipe under all-inclusive (including excavation) paymentDanville FEGC 028-3(32)2/23/2011
900.640M, LF150 mm (6 Inch) Underdrain Pipe, Dry SwaleDry swale stormwater treatmentRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.640M, LF150 mm (6 Inch) Underdrain Pipe, Dry Swale with Stone FillDry swale stormwater treatmentRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.640M, LF150 mm (6 Inch) Underdrain Pipe, Porous PavementAlternate porous pavement structureUsed under Category II Experimental Work PlanRandolph CMG PARK(21)S8/22/2007
900.640M, LF200 mm (12 Inch) Underdrain Pipe, Porous PavementAlternate porous pavement structureUsed under Category II Experimental Work PlanRandolph CMG PARK(21)S8/22/2007
900.640M, LF8 Inch Underdrain PipeFurnishing and placing underdrain pipe in drain curtainCambridge STP 0235(9)8/19/2009
900.640M, LFAdditional Spider Plow Pre-RippingPerforming additional pre-rip passes with a spider plow for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFAdditional Tractor Plow Pre-RippingPerforming additional pre-rip passes with a tractor plow for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFAir Test HDPE Conduits and Install Mule TapeTesting HDPE ducts and installing pull string in installed ducts for fiber optic projectWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.640M, LFAluminized Steel Pipe LinerRetrofitting an existing culvertSharon IM CULV(18)8/26/2009
900.640M, LFAluminum Approach RailingFurnishing and erecting aluminum approach railingBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.640M, LFAluminum Guardrail, Anodized 2 RailAnodized aluminum guardrailBarre City BHF 6000(15)S2/25/2009
900.640M, LFAluminum Pipe LinerRetrofitting an existing culvertIrasburg STP CULV(20)12/15/2010
900.640M, LFBand Joint @Precast Concrete Railroad CrossingBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.640M, LFBarbed Wire FenceFurnishing and installing barbed wire fencingBrandon NH 019-3(495)9/23/2009
900.640M, LFBarrier for Temporary Traffic ProtectionFurnishing barrier for establishing and maintaining temporary traffic protection during construction operationsPavement reclaiming projectsGranville ER STP 013-4(40)7/15/2015
900.640M, LFBox Beam Guardrail Repairs, WeatheringRepairing and/or adjusting existing weathering steel box beam guardrailMiddlebury STP 2627(1)/Ripton-Hancock STP 2803(1)1/27/2010
900.640M, LFBox Beam Guardrail w/7 Feet PostsBox beam guardrail with longer postsBethel-Randolph STP 2921(1)5/27/2015
900.640M, LFBox Beam Guardrail w/8 Feet PostsBox beam guardrail with longer postsEast Haven BRF 0269(11)8/31/2011
900.640M, LFBox Beam Guardrail, PaintedPainted steel box beam guardrailNewport City BRO 1449(25)12/21/2011
900.640M, LFBox Beam Guardrail, TrussGuardrail approach to steel truss bridgeRichmond BHF 0209(6)1/28/2009
900.640M, LFBox Beam Guardrail, WeatheringWeathering steel box beam guardrailWeathersfield AC BHO 1442(29)3/21/2007
900.640M, LFBridge Expansion Joint and Cover AssemblyAlternate bridge expansion joint detailSwanton STP ST MHTB(1)2/27/2008
900.640M, LFBridge Expansion Joint, ModularAlternate bridge expansion joint detailAlburgh-Rouses Point BHF MEMB(24)(Re-advertised)1/11/2012
900.640M, LFBridge Expansion Joint, Sliding PlateAlternate bridge expansion joint detailBennington AC NH 019-1(53)5/30/2007
900.640M, LFBridge Fiberglass Drain SystemRemove and replace existing bridge drainage systemWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.640M, LFBridge Railing Repair, Pipe and SpindleRetrofitting existing pipe and spindle bridge railingSpringfield BHF 016-2(14)4/1/2009
900.640M, LFBridge Railing Repair, Type IVRetrofitting existing galvanized 2 rail box beam bridge railingArlington STP 2334(1)/Arlington-Dorset STP 2625(1)9/1/2010
900.640M, LFBridge Railing, F-Shape ConcreteCast-in-place concrete bridge railing (F-shape)Chester BRF 016-1(25)3/26/2008
900.640M, LFBridge Railing, Galvanized 2 Rail Box Beam/Curb MountedCurb mounted box beam bridge railingWarren BRF 013-4(14)8/8/2012
900.640M, LFBridge Railing, Galvanized 2 Rail Box Beam/Fascia MountedFascia mounted box beam bridge railingWarren-Waitsfield STP 2506(1)1/16/2013
900.640M, LFBridge Railing, Galvanized 3 RailModification to NETC bridge railing configurationBennington AC NH 019-1(53)5/30/2007
900.640M, LFBridge Railing, Galvanized 3 Rail Box BeamAlternate bridge railing configurationRoxbury BHF 0187(8)/ER 0187(9)9/23/2011
900.640M, LFBridge Railing, Galvanized HDSB/Curb Mounted/Steel TubingAlternate bridge railing configurationCraftsbury BRO 1449(24)6/17/2009
900.640M, LFBridge Railing, Galvanized HDSB/Fascia Mounted/Hand RailAlternate bridge railing configurationReadsboro BRO 1441(25)1/27/2010
900.640M, LFBridge Railing, Galvanized HDSB/Fascia Mounted/Steel TubingAlternate bridge railing configurationBrattleboro BRO 1442(35)11/13/2013
900.640M, LFBridge Railing, Galvanized Metal Baluster Railing/Concrete Parapet CombinationAlternate bridge railing configurationNewport City BRO 1449(25)12/21/2011
900.640M, LFBridge Railing, Galvanized Metal Hand Railing/Concrete Parapet CombinationAlternate bridge railing configurationBarre Town BRF 6100(7)10/17/2012
900.640M, LFBridge Railing, Galvanized Steel TubingAlternate bridge railing configurationRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.640M, LFBridge Railing, Steel/PedestrianAlternate bridge railing designWallingford STP ST WALK(14)2/4/2009
900.640M, LFBridge Railing, TexasCast-in-place concrete bridge railing (Texas railing)Burke BRF 0269(13)11/26/2014
900.640M, LFBridge Railing, TrussSteel truss bridge railingMontpelier BF BPNT(17)6/25/2014
900.640M, LFBridge Railing, Weathering HD Steel Beam/Curb MountedWeathering steel HD steel beam bridge railingRochester-Chittenden-Rochester STP 2505(1)S1/17/2007
900.640M, LFBridge Railing, Weathering HD Steel Beam/Fascia MountedWeathering steel HD steel beam bridge railingRipton FH 010-1(42)11/12/2009
900.640M, LFBridge-Mounted Duct BankFurnishing and installing bridge-mounted utility duck bank(s) and associated joint assemblies, structural steel supports, utility support hanger assemblies, and abutment penetrationsBennington BRF 1000(16)9/3/2014
900.640M, LFCAAP, All-InclusiveFurnishing and installing CAAP culvert under all-inclusive (including excavation and backfill) paymentDanville FEGC 028-3(32)2/23/2011
900.640M, LFCat Plow Installation of HDPE Inner DuctPlowing HDPE innerducts for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFChain-Link Fence, Concrete MountedFurnishing and erecting chain-link fence on a precast concrete boxBennington AC NH 019-1(52)2/13/2008
900.640M, LFConcrete Encased Duct Bank, X DuctsConstructing underground concrete encased duct bank for utility servicesBennington BRF 1000(16)9/3/2014
900.640M, LFConcrete Encasement of Conduits or DuctsEncasing conduit or duct structures for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFConcrete Median Barrier, BridgeFurnishing and erecting CIP concrete median barrier on a bridgeBennington AC NH 019-1(54)3/24/2010
900.640M, LFContinuous Welded RailRemoving existing rails and furnishing and installing new continuous welded rail (CWR)Berlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.640M, LFCoring ConcreteCoring through existing substructure units and mortaring bar reinforcement in placeBennington ER BHF 010-1(45)10/3/2012
900.640M, LFCorrugated Pipe Liner, CAAPLining an existing culvert with CAAP linerSouth Burlington-Colchester IM CULV(23)3/30/2011
900.640M, LFCorrugated Pipe Liner, HDPELining an existing culvert with HDPE linerSouth Burlington-Colchester IM CULV(23)3/30/2011
900.640M, LFCPEP(SL), All-InclusiveFurnishing and installing CPEP(SL) culvert under all-inclusive (including excavation and backfill) paymentRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFCPEP, All-InclusiveFurnishing and installing CPEP culvert under all-inclusive (including excavation and backfill) paymentDanville FEGC 028-3(32)2/23/2011
900.640M, LFCured-In-Place Pipe LinerRetrofitting an existing culvertWeathersfield STP 0146(11)4/24/2013
900.640M, LFDirect Burial Duct Bank, 1-4 DuctsConstructing direct burial conduit systems for underground utility servicesDanville FEGC 028-3(32)2/23/2011
900.640M, LFDrilled Shaft in EarthConstructing drilled shaft in earthNew Haven BRF 0183(1)8/26/2015
900.640M, LFDrilled Shaft in RockConstructing drilled shaft in rockCambridge BRF 027-1(4)/STP 030-2(27)6/27/2012
900.640M, LFDrilled Shaft Obstruction Drilling and RemovalDrilling and removing obstruction(s) for drilled shaft placementNew Haven BRF 0183(1)8/26/2015
900.640M, LFDuct BankConstructing underground concrete encased conduit systemsNewport City BRO 1449(25)12/21/2011
900.640M, LFDuctile Iron Pipe, Cement LinedSanitary sewer line constructionRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFDuctile Iron Pipe, Cement Lined, All-InclusiveFurnishing and installing ductile iron pipe under all-inclusive (including excavation and backfill) paymentRutland City BRF 3000(18)3/26/2014
900.640M, LFDurable Centerline Marking, Imprinted/ColorizedAlternate (imprinted) centerline designBurlington STP 2721(1)10/13/2010
900.640M, LFDurable Crosswalk Marking, Imprinted/ColorizedAlternate (imprinted) crosswalk designBethel-Randolph-Northfield STP 2922(1)1/23/2013
900.640M, LFDurable Crosswalk Marking, Inlaid ThermoplasticAlternate (inlaid thermoplastic) crosswalk designWilmington AC NH 2504(1)S/HES 010-1(38)5/7/2008
900.640M, LFErosion Sock, Straw WattlesFurnishing and installing straw wattle erosion socksHartford-Sharon FITS(503)10/20/2010
900.640M, LFExpansion Device, Hinged Sliding Plate AssemblyFurnishing and installing steel hinged sliding plate assembly expansion device(s)Brookfield BRF FLBR(2)1/8/2014
900.640M, LFFabric Screening FenceFurnishing, erecting, maintaining, and removing privacy fenceBrattleboro BRO 1442(35)11/13/2013
900.640M, LFFiber Optic CableFurnishing and installing fiber optic cableHartford-Sharon FITS(503)10/20/2010
900.640M, LFFiber Reinforced Polymer (FRP), SAFSTRIPFurnishing and installing Fiber Reinforced Polymer (FRP) for bridge rehabilitationUsed under Category II Experimental Work PlanSwanton IM 089-3(70)4/17/2013
900.640M, LFFurnish and Install Multi-duct Conduit SystemFurnishing and installing a multi-duct conduit (MDC) systemWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.640M, LFGaging TrackCorrecting track gage conditionsRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.640M, LFGate for Ornamental Fence, 4 FeetFurnishing and installing gate for ornamental fenceDanville FEGC 028-3(32)2/23/2011
900.640M, LFGlare ScreenFurnishing and installing glare screen for work zone safetyWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.640M, LFGranite Post and Chain FenceFurnishing and installing granite post and chain fenceBarre Town HES 026-1(38)2/20/2008
900.640M, LFGranite Post and Wood Diamond Rail FenceFurnishing and installing granite post and wood diamond rail fence as artistic enhancement in village areaDanville FEGC 028-3(32)2/23/2011
900.640M, LFGuardrail Transition, Steel Beam to Box BeamFurnishing and erecting guardrail transitionJohnson BRF 030-2(26)7/16/2014
900.640M, LFHD Steel Beam Guardrail, WeatheringWeathering steel HD steel beam guardrailWood postsCharlotte BHO 1445 (34)10/24/2012
900.640M, LFHD Steel Beam Guardrail, Weathering w/8 Feet PostsWeathering steel HD steel beam guardrail using long postsWood postsMontgomery BHO 1448(37)6/18/2008
900.640M, LFHD Steel Beam Guardrail, Weathering w/8 Feet PostsWeathering steel HD steel beam guardrail using long postsRockingham BHO 1442(34)5/20/2009
900.640M, LFHD Steel Beam Guardrail, Weathering/Curb MountedWeathering steel HD steel beam guardrailRochester-Chittenden-Rochester STP 2505(1)S1/17/2007
900.640M, LFHD Steel Beam Guardrail, Weathering/Fascia MountedWeathering steel HD steel beam guardrailMontgomery BHO 1448(37)6/18/2008
900.640M, LFHD Steel Beam Guardrail, Weathering/NestedWeathering/nested steel HD steel beam guardrailMiddlebury STP 2627(1)/Ripton-Hancock STP 2803(1)1/27/2010
900.640M, LFHD Steel Beam Guardrail, Weathering/Nested w/8 Feet PostsWeathering/nested steel HD steel beam guardrail using long postsMiddlebury STP 2627(1)/Ripton-Hancock STP 2803(1)1/27/2010
900.640M, LFHorizontal Directional DrillingFurnishing and installing underground drainage (or utilities) using HDDBerlin STPG SGNL(40)11/12/2014
900.640M, LFHorizontal Directional Drilling in EarthDirectional boring or drilling in earth for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFHorizontal Directional Drilling in RockDirectional boring or drilling in rock for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFHybrid Rock Fall Barrier/Drape System, Fence ComponentFurnishing and installing protection system for ledge removal operationsUsed under Category II Experimental Work PlanHartford-Newbury IM 091-2(72)8/12/2009
900.640M, LFImpact Displacement PierFurnishing and installing impact displacement pierSpecialty work performed under Category II Experimental Work PlanCornwall BRS 0172(6)3/24/2010
900.640M, LFImpact Displacement Pier Obstruction RemovalRemoving obstructions for impact displacement pier installationSpecialty work performed under Category II Experimental Work PlanCornwall BRS 0172(6)3/24/2010
900.640M, LFInclinometer CasingGeotecnical instrumentation (for embankment settlement monitoring)Cornwall BRS 0172(6)3/24/2010
900.640M, LFInfiltration TrenchConstructing an infiltration trenchWaterbury CMG PARK(11)S (Re-advertised)12/9/2009
900.640M, LFInjection HoleInjection hole for pavement stabilizationSpecialty work performed under Category II Experimental Work PlanHartford IM 089-1(60)8/21/2013
900.640M, LFInner Guard RailConstructing inner guard rail on a railroad bridgeRockingham STP GMRC(1)11/10/2010
900.640M, LFJointed Rail (Relay 105DY)Berlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.640M, LFLine DrillingPerforming line drilling for removing solid rock subgradeBrandon NH 019-3(495)9/23/2009
900.640M, LFMaintenance and Removal of Temporary Traffic BarrierFor utilizing existing traffic barrier on projectNorth Hero-Grand Isle BHF 028-1(21)10/24/2007
900.640M, LFMetal Hand RailingAlternate structural shape metal hand railingStatewide STP SDWK(11)10/16/2013
900.640M, LFMicropile, CasedFurnishing and installing cased micropilesWoodstock BRF 0151(21)9/30/2015
900.640M, LFMicropile, UncasedFurnishing and installing uncased micropilesWoodstock BRF 0151(21)9/30/2015
900.640M, LFObstruction Removal for Driving PilesRemoving foundation materials that prohibit the driving of pilesJamaica ER BRF 013-1(16)10/31/2012
900.640M, LFOrnamental Fence, 4 FeetFurnishing and installing ornamental fenceJericho STP FTBR(3)5/7/2014
900.640M, LFPCCSP, All-InclusiveFurnishing and installing PCCSP culvert under all-inclusive (including excavation and backfill) paymentDanville FEGC 028-3(32)2/23/2011
900.640M, LFPedestrian Hand RailingFurnishing and erecting pedestrian hand railingWilliamstown BRS 0204(4)4/23/2008
900.640M, LFPedestrian Railing, SteelFurnishing and erecting steel pedestrian railingRichmond BHF 0209(6)1/28/2009
900.640M, LFPipe RammingPerforming trenchless installation of drainage pipeSouth Burlington IM SCRP(3)2/3/2010
900.640M, LFPlank RailFurnishing and installing timber plank railPawlet/Rupert RREW 12L-P5/22/2013
900.640M, LFPolyethylene Pipe SleevePipe sleeve for utilitiesBarre Town HES 026-1(38)2/20/2008
900.640LFPre-excavation of Integeral Abutment PilesLoosening or removing foundation materials to permit the driving or placing of pilesBurke BRF 0269(13)11/26/2014
900.640LFPre-excavation of Integeral Abutment Piles, EarthLoosening or removing foundation materials to permit the driving or placing of pilesFairfield BRF 0281(25) & BRO 1448(41)9/17/2014
900.640LFPre-excavation of Integeral Abutment Piles, RockLoosening or removing foundation materials to permit the driving or placing of pilesFairfield BRF 0281(25) & BRO 1448(41)9/17/2014
900.640M, LFPrefabricated Vertical Wick DrainFurnishing and placing prefabricated vertical wick drain(s)Cornwall BRS 0172(6)3/24/2010
900.640M, LFPrefabricated Vertical Wick Drain Obstruction RemovalRemoving obstructions for prefabricated vertical wick drain installationCornwall BRS 0172(6)3/24/2010
900.640M, LFPre-Insulated Ductile Iron Pipe, Cement LinedSanitary sewer and/or waterline line constructionHartford (Wilder) STP 1444(35)7/14/2010
900.640MPressure Treated Board Fence, 1.8 MFurnishing and installing pressure treated board fenceMorristown STP F 029-1(2)2/13/2013
900.640M, LFPrestressed Concrete Next D BeamsFurnishing and installing prestressed concrete Next D beamsAndover BHF 016-1 (29)2/18/2015
900.640M, LFPrestressed Concrete Next F BeamsFurnishing and installing prestressed concrete Next F beamsJohnson BRF 030-2(26)7/16/2014
900.640M, LFPrestressed Concrete Non-Voided SlabsFurnishing and installing prestressed concrete non-voided slabsBrattleboro BRO 1442(35)11/13/2013
900.640M, LFPrestressed Concrete Solid SlabsManufacturing, transporting, and erecting precast prestressed concrete membersFairfield BRF 0281(25) & BRO 1448(41)9/17/2014
900.640M, LFProtective ScreeningProtective screening for shared use pathBennington AC NH 019-1(53)5/30/2007
900.640M, LFPVC Drain PipeSanitary sewer line constructionHartford IM BLDG(10)6/4/2008
900.640M, LFPVC Sewer PipeSanitary sewer line constructionRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFRaise, Align, and Surface TrackRaising, aligning, and surfacing track for railroad track constructionBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.640M, LFRapid Grouting of Shear KeysGrouting shear keys with rapid-setting non-shrink grout materialMiddlebury WCRS(9)6/24/2015
900.640M, LFRapid Setting GroutGrounting anchor bolts and approach slab dowels with approved non-shrink grout materialCavendish RREW12K2/4/2015
900.640M, LFRCP Class III, All-InclusiveFurnishing and installing RCP culvert under all-inclusive (including excavation and backfill) paymentDanville FEGC 028-3(32)2/23/2011
900.640M, LFRehabilitate Existing FenceRehabilitating existing right-of-way fenceBolton-Waterbury STP 2709(1)5/15/2013
900.640M, LFReinforced Concrete InvertRetrofitting an existing culvert invertWinhall STP CULV(22)2/16/2011
900.640M, LFRemovable Metal Hand RailingFurnishing and erecting removal metal hand railingCambridge BRF 027-1(4)/STP 030-2(27)6/27/2012
900.640M, LFRemoval and Replacement of Relay Continuous Welded RailFurnishing and installing relay continuous welded rail (CWR)Proctor-Middlebury STP WCRS(7)5/5/2010
900.640M, LFRemoval and Replacement of Switch TimbersRemoving and replacing existing timber switch tiesRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFRemoval of Existing Railroad TracksRemoving existing railroad tracksRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFRemoval of Temporary Traffic BarrierRemoving existing temporary traffic barrierJericho STP FTBR(3)5/7/2014
900.640M, LFRemove and Replace Compression Joint SealRetrofitting existing bridge jointWaterford IM MEMB(31)5/9/2012
900.640M, LFRemove and Replace Drain TroughRemoving and replacing an existing drain troughHartland BHF BPNT(12)1/15/2014
900.640M, LFRemove and Replace Existing Approach RailingRemoving and replacing existing approach railingWaterford IM MEMB(31)5/9/2012
900.640M, LFRemove and Replace Existing Bridge RailingRehabilitating existing 3 rail box beam bridge railingCastleton-Rutland BF MEMB(38)4/16/2014
900.640M, LFRemove and Replace Railroad TracksRemoving and replacing, and resetting as required, existing railBarre City STP 026-1 (42)2/11/2015
900.640M, LFRemove and Reset Continuous Welded RailRemoving & resetting existing continuous welded rail (CWR). The work shall include furnishing all labor, materials, and equipment for removing and resetting the existing CWR, including but not limited to re-installing existing rail anchors and tie platesNew Haven RREW001B2/18/2015
900.640M, LFRemove and Reset Railroad Tracks (Cross Ties Included)Removing and resetting existing rail; unanticipated new bridge and/or cross ties includedRockingham RREW12J11/20/2013
900.640M, LFRemove and Reset Railroad Tracks (Cross Ties Not  Included)Removing and resetting existing rail; anticipated new bridge and/or cross ties paid separatelyMiddlebury WCRS(9)6/24/2015
900.640M, LFRemove and Restore Asphalt PavingRemoving and restoring asphalt paving for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFRemove and Restore Drain TroughRemoving and restoring an existing drain troughHartland BHF BPNT(12)1/15/2014
900.640M, LFResurface Track ApproachesLowering or raising the tops of rails and ties within the track approaches (see also 900.645 for Regrading)Clarendon STP 2033(25)/Ludlow STP 2033(23)5/13/2015
900.640M, LFRock AnchorFurnishing and installing rock anchorsRochester BRF 0162(16)(17)/ER BRF 0162(18)(19)9/25/2013
900.640M, LFRock DowelingRock doweling ledge slopesTownshend STP 015-1 (22)2/18/2015
900.640M, LFRock DrainInstalling rock drains on rock slopesTownshend STP 015-1 (22)2/18/2015
900.640M, LFRock Nail for ShotcreteReinforcing for shotcrete on rock slopesRockingham IM 091-1(57)6/16/2010
900.640M, LFRockfall Barrier FenceFurnishing and installing rockfall barrier fenceBerlin-Montpelier IM 089-1(53)11/2/2011
900.640M, LFRubber Rail SealFurnishing and installing rail seals at reconstructed grade crossingsRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.640M, LFSanitary Force MainSanitary sewer line constructionHartford IM BLDG(10)6/4/2008
900.640M, LFSeamless Copper Water TubeFurnishing and installing seamless copper water tubeRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFSeamless Copper Water Tube, All-InclusiveFurnishing and installing seamless copper water tube under all-inclusive (including excavation and backfill) paymentDanville FEGC 028-3(32)2/23/2011
900.640LFSidewalk Expansion JointFurnishing and installing expansion material in bridge sidewalk expansion jointsLyndon BF MEMB(39)6/4/2014
900.640LFSoil AnchorFurnishing and installing soil anchorsHighgate STP 0297(8)(Re-advertised)2/6/2013
900.640M, LFSpider Plow Installation of HDPE Inner DuctPlowing HDPE innerducts for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFSplit Rail FenceFurnishing and erecting split rail fenceRandolph CMG PARK(21)S8/22/2007
900.640M, LFSteel Backed Timber Guardrail, Fascia MountedFurnishing and erecting fascia mounted steel backed timber guardrailShrewsbury BHO 1443 (49)1/7/2015
900.640M, LFSteel Backed Timber Guardrail, Painted w/Weathering Steel PostsAlternate guardrail configurationRandolph BHO 1444(51)2/18/2009
900.640M, LFSteel Beam Guardrail, WeatheringWeathering steel beam guardrailStatewide - NW Region STP HRRR(13)/HSIP(4)7/25/2012
900.640M, LFSteel Beam Guardrail, Weathering w/8 feet PostsWeathering steel beam guardrailMiddlebury STP 2627(1)/Ripton-Hancock STP 2803(1)1/27/2010
900.640M, LFSteel Piling, Concrete-Filled (Size) PipeFurnishing and installing concrete-filled pipe pilingWallingford STP ST WALK(14)2/4/2009
900.640M, LFSteel Sleeve, Smooth WalledAlternate utility sleeve materialHartford IM BLDG(10)6/4/2008
900.640M, LFStone Diaphragm for Grass ChannelFurnishing and installing stone diaphragm(s) for grass channel(s) as stormwater treatmentCornwall BRS 0172(6)3/24/2010
900.640M, LFSurface and Align Railroad TracksLowering or raising tops of rails and ties withing track approachesRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.640M, LFTemporary Pedestrian Safety RailFurnishing, assembling, relocating and resetting as necessary, and removing temporary pedestrian safety railBennington BRF 1000(16)9/3/2014
900.640M, LFTemporary SwaleTemporary swale stormwater treatmentBennington AC NH 019-1(54)3/24/2010
900.640M, LFTemporary Water Diversion BarrierFurnishing, placing, resetting, and removing temporary water diversion barrierWoodford ER NH 010-1 (47)1/21/2015
900.640M, LFTimber Backing for GuardrailFurnishing and installing timber backing for guardrailCharlotte-South Burlington NH 2907(1)5/23/2012
900.640M, LFTimber Fence with PicketsFurnishing and installing timber picket fenceSwanton STP ST MHTB(1)2/27/2008
900.640M, LFTransite Pipe RemovalLocating, removing, and disposing of transite asbestos sewer pipeRutland City BRF 3000(18)3/26/2014
900.640M, LFTrench and Place PVC Conduits in EarthPlacing PVC conduits in earth for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFTrench and Place Steel Pipe Carriers in EarthPlacing steel pipe carriers in earth for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFTrench and Place Steel Pipe Carriers in Rocky SoilsPlacing steel pipe carriers in rocky soils for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.640M, LFTrench DrainConstructing a trench drain systemHartford (Wilder) STP 1444(35)7/14/2010
900.640M, LFTrenchless PipeFurnishing and installing pipe culvert utilizing trenchless construction (see also 900.645)South Burlington-Colchester IM CULV(23)3/30/2011
900.640M, LFTrenchless Pipe with Cement Mortar LiningFurnishing and installing pipe utilizing trenchless constructionNew Haven/Ferrisburgh RREW001A/C/D3/4/2015
900.640M, LFUnderground Cable for AirportsFurnishing and installing underground cable at airportsAirport projectsHighgate AIR 04-31832/6/2008
900.640M, LFVertical Granite Curb, MountableConstructing mountable vertical granite curbHyde Park HES 030-2(34)6/3/2015
900.640M, LFVertical Granite Curb, UnfinishedConstructing unfinished vertical granite curbBarre City FEGC F 026-1(34)C/24/6/2011
900.640M, LFWater BarWater bar stormwater treatmentBennington AC NH 019-1(52)2/13/2008
900.640M, LFWildlife Guide FenceFurnishing and installing wildlife guide fenceBridport STP CULV(29)10/1/2014
900.640M, LFWood Post and Chain FenceFurnishing and erecting wood post and chain fenceAddison STP 032-1(18)8/15/2012
900.645LS(In-Water Sediment Isolation Device)Woodstock BRF 0151(21)9/30/2015
900.645LSAdjust Length of EyebarsAdjusting the length of eyebar components on a steel through truss railroad bridgeBarnet STRB(36)8/3/2011
900.645LSArch LightingFurnishing and installing light fixtures inside a precast concrete archMiddlebury RS 0174(8)9/11/2013
900.645LSBluetooth Observation SystemBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.645LSBridge Instrumentation for Integral AbutmentsGeotechnical instrumentation for integral abutmentsEast Montpelier BRF 028-3(36)2/18/2009
900.645LSBus ShelterFurnishing and installing a bus shelterSpringfield CMG PARK(32)7/23/2014
900.645LSClearingClearing around existing right-of-way fenceBolton-Waterbury STP 2709(1)5/15/2013
900.645LSComposite Arch SuperstructureDesigning, manufacturing, transporting, and erecting composite arch superstructure"Bridge in a Backpack"Fairfield BRO 1448(38)11/20/2013
900.645LSConcrete Arch Slab on FRP DeckingDesigning, manufacturing, transporting, and attaching FRP deck panels and concrete decking to composite arch tubes"Bridge in a Backpack"Fairfield BRO 1448(38)11/20/2013
900.645LSConcrete Steps with Handrail ExtensionsFurnishing and installing new concrete steps with handrail extensionsStatewide STP SDWK(11)10/16/2013
900.645LSConstruction Vibration and Crack MonitoringMonitoring construction operations and protecting properties in work zoneBurke BRF 0269(13)11/26/2014
900.645LSContainment and Disposal Of Lead Paint Cleaning ResiduesWaste management for lead paint removal from existing bridgesBennington-Mt. Tabor BF BPNT (16)(RE-AD)5/20/2015
900.645LSContractor-Fabricated Precast Concrete StructureManufacturing, transporting, handling, and erecting precast concrete structure components fabricated by the ContractorNew Haven BRF 0183(1)8/26/2015
900.645LSContractor-Fabricated Precast Concrete Structure (Concrete/Steel Pier Cap)Manufacturing, transporting, and erecting a precast concrete/steel composite pier cap unitNew Haven BRF 0183(1)8/26/2015
900.645LSCovered WalkwayConstructing a covered timber walkway with lightingStowe BRF 0235(11)8/13/2014
900.645LSCPM SchedulePreparing, submitting, and modifying Critical Path Method (CPM) construction schedule(s) for the Contract workJamaica ER STP 013-2 (12)3/11/2015
900.645LSDanville CircleConstructing artistic enhancement in village areaDanville FEGC 028-3(32)2/23/2011
900.645LSDecommission PipeAbandonment of existing pipe(s)Peru STP SCRP (4)1/21/2015
900.645LSDemolition of Above Ground Electric VaultRemoving an existing vault and reconnecting existing lightingBristol HES 021-1(28)(Re-Advertised)7/23/2014
900.645LSDesign and Construct BridgeDesigning and constructing a bridge superstructure and substructureHartford (Wilder) STP 1444(35)7/14/2010
900.645LSDisposal of Utility Transformer and AppurtenancesTransporting and disposing of an electrical utility transformerBennington AC NH 019-1(54)3/24/2010
900.645LSDry HydrantFurnishing and installing a dry hydrantBristol STP F 021-1(15)6/5/2013
900.645LSElectric DemolitionRemoving existing lighting system(s)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.645LSElectric Heat Trace SystemSanitary sewer and/or water line construction (see also 900.645 Sewer and Water Main on Bridge)Hartford (Wilder) STP 1444(35)7/14/2010
900.645LSElectric Power Board and CabinetFurnishing and installing an electric power board and cabinet (see also 900.620)Rutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.645LSEMS Locator DevicesSupplying Electronic Marker System (EMS) devices for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.645LSEPSC PlanAlternate EPSC protocol for non-jurisdictional and low risk projectsTo be used under Agency conditional approval onlyWarren ER-STP 013-4(36)11/9/2011
900.645LSFiber Reinforced Polymer PontoonsDesigning, furnishing, and installing Fiber Reinforced Polymer (FRP) pontoons for floating bridgeBrookfield BRF FLBR(2)1/8/2014
900.645LSField Metalizing of Existing Structural SteelField surface preparation and field application of thermal spray metalizing to existing bridge surfaces followed by the application of a clear sealer coatBennington-Mt. Tabor BF BPNT (16)1/28/2015
900.645LSField Office, EngineersAlternate field office specificationCastleton STP 2033(26)8/19/2015
900.645LSFieldstone WallConstructing fieldstone wall as artistic enhancement in village areaDanville FEGC 028-3(32)2/23/2011
900.645LSFire Detection SystemFurnishing and installing linear heat and fire detection system on covered bridgeMiddlebury-Weybridge BHO 1445(33)10/19/2011
900.645LSFloating DockTemporary floating dock during constructionNew Haven-Weybridge BHO BTN 2005(1)3/7/2007
900.645LSFurnish and Install Storm Drain PipeFurnishing and installing underground storm drain utilizing trenching or trenchless methodsBarre City FEGC F 026-1(34)C/24/6/2011
900.645LSFurnishing Equipment for Installing MicropilesFurnishing Equipment for Installing MicropilesWoodstock BRF 0151(21)9/30/2015
900.645LSGPS Machine Control GradingGrading construction using Global Positioning System (GPS) maching grading techniquesPavement reclaiming projectsBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.645LSHandling, Transport, and Re-erection of Covered Bridge SuperstructureRehabilitating covered bridge superstructure off existing bridge locationCharlotte BHO 1445(34)10/24/2012
900.645LSHandling, Transport, and Re-erection of Truss Bridge SuperstructureRehabilitating truss bridge superstructure off existing bridge locationHartford (Wilder) STP 1444(35)7/14/2010
900.645LSImpact Displacement Pier DesignDesigning impact displacement pierSpecialty work performed under Category II Experimental Work PlanCornwall BRS 0172(6)3/24/2010
900.645LSImpact Displacement Pier MobilizationMobilizing for impact displacement pier installationSpecialty work performed under Category II Experimental Work PlanCornwall BRS 0172(6)3/24/2010
900.645LSIncorporating Salvaged Bridge ComponentsIncorporating bridge components previously removed and stored at a remote locationCovered bridgeWoodstock BHO 1444(52)8/8/2012
900.645LSIncorporating Salvaged Bridge ComponentsIncorporating bridge components previously removed and stored at a remote locationSteel truss bridgeWallingford STP ST WALK(14)2/4/2009
900.645LSInsertion Valve with Valve BoxFurnishing and installing insertion valve with valve boxDanville FEGC 028-3(32)2/23/2011
900.645LSInstall Steel Grid Flooring, BridgeInstalling Agency-supplied steel grid flooringRichmond BHF 0209(6)1/28/2009
900.645LSInstall Steel Grid Flooring, SidewalkInstalling Agency-supplied steel grid flooringRichmond BHF 0209(6)1/28/2009
900.645LSIntelligent Compaction EquipmentConstructing Hot Mix Asphalt (HMA) using Intelligent Compaction (IC) rollersCastleton-West Rutland AC STP 2705(1)/Castleton AC STP 2908(1)/AC STP 2909(1)9/28/2011
900.645LSIntelligent Compaction for Bituminous ConcreteConstructing Hot Mix Asphalt (HMA) using Intelligent Compaction (IC) rollersPavement reclaiming projectsBethel-Randolph STP 2921(1)5/27/2015
900.645LSIntelligent Compaction for Subbase/RSBConstructing subbase or Reclaimed Stabilized Base (RSB) using Intelligent Compaction (IC) rollersPavement reclaiming projectsBethel-Randolph STP 2921(1)5/27/2015
900.645LSLandscape Area RestorationPerforming landscape area restorationPeru STP SCRP (4)1/21/2015
900.645LSLighting for Covered BridgeFurnishing and installing a lighting system within a covered bridgeWoodstock BHO 1444(52)8/8/2012
900.645LSMaintenance of Existing Wastewater FlowsMaintaining existing wastewater flows during constructionBarre Town BRF 6100(7)10/17/2012
900.645LSMaintenance of Existing Water FlowsMaintaining existing water flows during constructionShrewsbury STP 1443(44)8/20/2014
900.645LSMaintenance of Pedestrian TrafficEstablishing and maintaining pedestrian traffic, including accessibility and protective measures, for urban reconstructionStatewide STP SDWK(11)10/16/2013
900.645LSMaintenance of Traffic SignalMaintaining a traffic signalWaterbury IM 089-2(43)/NHG SGNL(43)9/25/2013
900.645LSMapmakerConstructing artistic enhancement in village areaDanville FEGC 028-3(32)2/23/2011
900.645LSMetalizing of Structural SteelShop performed surface preparation and application of thermal sprayed metallic coating (metalizing); the application of a sealer coat; and field touch-up repairs following site erection of the coated structureNew Haven BRF 0183(1)8/26/2015
900.645LSMobilization of Drilled Shaft EquipmentProviding equipment for installing drilled shaft(s)New Haven BRF 0183(1)8/26/2015
900.645LSMobilization/DemobilizationModified schedule for lump sum paymentSalisbury WCRS(15)/Middlebury WCRS(16)(Re-advertised)4/17/2013
900.645LSPaved Rail-Highway CrossingConstructing paved rail-highway crossing(s)Brattleboro STP 2623(1)/Brattleboro STP 2000(24)4/28/2010
900.645LSPedestal WallDesigning, detailing, fabricating, furnishing, and erecting pedestal wall(s)Warren ER-STP 013-4(36)11/9/2011
900.645LSPenstock Demolition and Site PreparationDemolishing and removing existing penstock and preparing site for new penstock constructionCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.645LSPost-Tensioning, Pier CapFurnishing, installing, stressing, and grouting prestressing steel for precast and cast-in-place concrete elementsJamaica ER BRF 013-1(16)10/31/2012
900.645LSPost-Tensioning, Pier Sub-CapFurnishing, installing, stressing, and grouting prestressing steel for precast and cast-in-place concrete elementsJamaica ER BRF 013-1(16)10/31/2012
900.645LSPrecast Concrete Grade Crossing SurfaceFurnishing and installing a panelized precast concrete railroad grade crossing surfaceBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.645LSPrecast Concrete/Steel Composite Pier CapManufacturing, transporting, and erecting a precast concrete/steel composite pier cap unitNew Haven BRF 0183(1)8/26/2015
900.645LSPrefabricated Truss BridgeDesign, fabrication, transport, and eretion of a truss bridge superstructureWarren BRF 013-4(14)8/8/2012
900.645LSPressure Reducing VaultFurnishing and installing pressure reducing vaultDanville FEGC 028-3(32)2/23/2011
900.645LSPublic Protection for Bridge ProjectsProtecting pedestrian and vehicular traffic below bridge constructionWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.645LSQC/QA Clean and Paint Existing Steel Structures, Bare SteelCleaning and painting bare steel on existing bridgesBennington-Mt. Tabor BF BPNT (16)(RE-AD)5/20/2015
900.645LSQC/QA Cleaning and Painting Structural ComponentsCleaning and painting designated metal surfacesWindsor-Hartford IM BPNT(13)9/9/2015
900.645LSRadar Stop Bar Detection SystemFurnishing and installing radar stop bar detection equipment for existing traffic control signal systemHinesburg-Richmond STPG SGNL(38)2/23/2011
900.645LSReconstruct BandstandRemoving and disposing of existing, and designing, furnishing, and installing new bandstand structureDanville FEGC 028-3(32)2/23/2011
900.645LSRegrading Track ApproachesLowering or raising the tops of rails and ties within the track approaches (see also 900.640 for Resurface)Ferrisburgh RAIL 5306(1)8/25/2010
900.645LSRehabilitating Covered Bridge SuperstructureRehabilitating covered bridge superstructure at existing bridge locationTownshend STP SCTT(1)8/19/2015
900.645LSRehabilitating Truss Bridge SuperstructureRehabilitating truss bridge superstructure at existing bridge locationHartford (Wilder) STP 1444(35)7/14/2010
900.645LSRelocate and Remove Existing Temporary BridgeRelocating an existing temporary bridge for maintenance of trafficCanaan ER ST 0271(16)9/3/2008
900.645LSRemoval of Existing Grease CoatingRemoving grease preservative coating from existing structural steel membersWindsor-Hartford IM BPNT(13)9/9/2015
900.645LSRemoval of Existing Structural RampRemoving an existing concrete ramp and wallStatewide STP SDWK(11)10/16/2013
900.645LSRemoval of Temporary BridgeRemoving existing temporary bridgeEnosburg BRO 1448(40)10/23/2013
900.645LSRemoval of Temporary Bridge and ApproachesRemoving existing temporary bridge and roadway approachesBarnard ER BRF 0241(39)9/18/2013
900.645LSRemove and Relocate Existing Stone WallRemoving and relocating existing stone wall(s)Danville FEGC 028-3(32)2/23/2011
900.645LSRemove and Relocate Existing Timber Deck and StairwayRemoving and relocating existing timber structuresBrownington BRO 1449(28)2/4/2009
900.645LSRemove and Relocate Existing Timber StairwayRemoving and relocating existing timber structureBrownington BRO 1449(28)2/4/2009
900.645LSRemove and Replace Residentail WalkwayRemoving and replacing existing walk and stairwayReadsboro BRO 1441(25)1/27/2010
900.645LSRemove and Reset Bus ShelterRemoving and resetting an existing bus shelterStatewide STP SDWK(11)10/16/2013
900.645LSRemove and Reset Existing Stone WallRemoving and resetting existing stone wall(s)Barre Town STP SCRP(10)3/5/2014
900.645LSRemove and Reset Existing Timber DeckRemoving, storing, and resetting existing timber deckBarre City FEGC F 026-1(34)C/24/6/2011
900.645LSRemove and Salvage Concrete Wheel StopsRemoving and salvaging existing concrete wheel stopsDanville FEGC 028-3(32)2/23/2011
900.645LSRemove and Salvage Existing Bus ShelterRemoving and salvaging existing bus shelterWaterbury CMG PARK(11)S (Re-advertised)12/9/2009
900.645LSRemove and Salvage Wooden Retaining WallRemoving and salvaging existing wooden retaining wallDanville FEGC 028-3(32)2/23/2011
900.645LSRemove and Stockpile Stone WallRemoving and stockpiling an existing stone wallBennington AC NH 019-1(52)2/13/2008
900.645LSRepairing Stone Masonry, Jahn Permeable Mortar SystemRepairing existing stone masonryUsed under Category II Experimental Work PlanWoodstock BHO 1444(52)8/8/2012
900.645LSRetaining WallDesigning, fabricating, furnishing, and erecting a retaining wallCavendish RREW12K2/4/2015
900.645LSRetiming of Signal CorridorDeploying traffic signal timings in the corridor to be coordinatedWaterbury NHG SGNL(43)1/22/2014
900.645LSRock Anchor TestingTesting rock anchorsHighgate STP 0297(8)7/11/2012
900.645LSRock Dowel TestingTesting rock dowelsTownshend STP 015-1 (22)2/18/2015
900.645LSRWIS Labor and EquipmentTemporarily removing then re-installing RWIS equipmentSpecialty item as per Subsection 108.01(c) of Standard SpecificationsBrookfield-Berlin IM SURF(11)6/17/2009
900.645LSSewage Pump Station w/Valve VaultFurnishing and installing sanitary sewer pump station(s)Hartford IM BLDG(10)6/4/2008
900.645LSSewer Main on BridgeSewer main on a bridgeBarre Town BRF 6100(7)10/17/2012
900.645LSSewer Main on Bridge (w/Heat Trace pay item)Sewer main on a bridge w/separate heat trace pay itemJohnson BHO 1448(29)3/11/2009
900.645LSSluice GateFurnishing and installing a sluice gate for water elevation controlBennington AC NH 019-1(52)2/13/2008
900.645LSSmart Work Zone SystemFurnishing, installing, relocating, and operating a Smart Work Zone System (SWZS)Waterbury IM 089-2(43)/NHG SGNL(43)9/25/2013
900.645LSSpare Traffic Signal EquipmentFurnishing a replacement traffic signal camera and controllerRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.645LSStaff GaugeInstallation of a staff gaugePeru STP SCRP (4)1/21/2015
900.645LSSteel Bridge Truss Removal and DeliveryRemoving and delivering existing steel truss bridgeCorinth STP BRO 1447(22) (Re-advertised)8/20/2008
900.645LSStone Masonry Repair Material, Jahn Permeable Mortar SystemFurnishing material for repairing existing stone masonryUsed under Category II Experimental Work PlanWoodstock BHO 1444(52)8/8/2012
900.645LSStop Log SystemInstalling a stop log systemPeru STP SCRP (4)1/21/2015
900.645LSStream Habitat BouldersPlacing natural river boulders in a finished stream channelBraintree ER STP 0187(12)1/29/2014
900.645LSSurchargingSurcharging roadway embankmentsStockbridge BRF 022-1(20)5/12/2010
900.645LSSurface and Align Railroad TracksSurfacing and aligning railroad tracks for grade changeRockingham STP GMRC(1)11/10/2010
900.645LSTemporary Access Road and Staging Areas, CulvertAccessing and staging culvert repair site(s)EPSC under Section 900Hartford-Sharon IM 089-1(55)2/4/2009
900.645LSTemporary Access Road and Staging Areas, CulvertAccessing and staging culvert repair site(s)EPSC under Section 105 or Section 652South Burlington-Colchester IM CULV(23)3/30/2011
900.645LSTemporary Access Road and Staging Areas, CulvertAccessing and staging culvert repair site(s)EPSC under Section 900Hartford-Sharon IM 089-1(55)2/4/2009
900.645LSTemporary Access Road and Staging Areas, SlideAccessing and staging slide repair site(s)EPSC under Section 652Essex STP 030-1(20)5/27/2009
900.645LSTemporary Bridge Widening for Phase ConstructionDesigning, constructing, maintaining, and removing a temporary bridge wideningEast Haven BRF 0269(11)8/31/2011
900.645LSTemporary Power for Navigational LightsFurnishing and installing a temporary power source for navigational lightsAlburgh-Rouses Point BHF MEMB(24)(Re-advertised)1/11/2012
900.645LSTemporary Relocation of StreamTemporary stream relocation during constructionEPSC under Section 105Roxbury BHF 0187(8)/ER 0187(9)9/23/2011
900.645LSTemporary Relocation of StreamTemporary stream relocation during constructionEPSC under Section 900Hartford-Sharon IM 089-1(55)2/4/2009
900.645LSTemporary Relocation of StreamTemporary stream relocation during constructionEPSC under Section 652Jamaica ER STP 013-2 (12)3/11/2015
900.645LSTemporary RoadwayTemporary roadway (w/out bridge) for maintenance of traffic during constructionLunenburg NH CULV(27)8/26/2015
900.645LSTemporary Roadway WideningTemporary roadway widening (w/out bridge) for maintenance of traffic during constructionHyde Park HES 030-2(34)6/3/2015
900.645LSTemporary Steel Sheet PilingInstalling temporary steel sheet piling under lump sum paymentBarre Town STP SCRP(10)3/5/2014
900.645LSTemporary Support of Water MainSupporting and protecting an operating water main during constructionBarre Town STP SCRP(10)3/5/2014
900.645LSTemporary Support, SewerFurnishing and installing temporary support structure for an existing sewer main on bridgeRichmond BHF 0209(6)1/28/2009
900.645LSTemporary Support, WaterFurnishing and installing temporary support structure for an existing water main on bridgeRichmond BHF 0209(6)1/28/2009
900.645LSTemporary Water LineInstalling, maintaining, and removing temporary water lineDanville FEGC 028-3(32)2/23/2011
900.645LSTemporary Water MainInstallation, testing, maintenance, and removal of a temporary water main; and transferring from existing service to the temporary water mainStowe BRF 0235(11)8/13/2014
900.645LSTemporary Work PlatformConstructing temporary work platform for performing repairs to a steel truss bridgeDummerston BHO 1442(28)4/29/2009
900.645LSThermal Profiling Equipment for Bituminous MaterialUsing thermal profiling quipment to determine uniformity in placement of asphalt mixtureStockbridge-Bethel STP 2910(1)4/23/2014
900.645LSTimber Coating, Environmental ProtectionAppropriate measures shall be taken (such as suitable protective coverings) to protect the public, the bridge structure, substructure, work area, river, etc. from coatings contamination and other damage due to the drippings, (continued in comments)(continued) spatter, and wind-blown particles of coatings, as well as from falling objects, etcTownshend STP SCTT(1)8/19/2015
900.645LSTimber Coating, Fire RetardantMaterials shall meet the requirements of 708.05(b) and 708.05(c) of the Standard SpecificationsTownshend STP SCTT(1)8/19/2015
900.645LSTimber Coating, Termiticide/Insecticide/FungicideMaterials shall meet the requirements of 708.05(b) and 708.05© of the Standard SpecificationsTownshend STP SCTT(1)8/19/2015
900.645LSTimber CoatingsField cleaning and  coating of new and existing timber members of a timber bridge with termiticide/insecticide/fungicide and fire retardant coatingsTownshend STP SCTT(1)8/19/2015
900.645LSTimber Deck, Railroad BridgeConstructing a new timber deck and backwall extension timbers on existing railroad bridgeNew Haven WCRS(18)5/14/2014
900.645LSTraffic Control, All-InclusiveProviding project traffic control under lump sum (flaggers, temporary traffic barrier, etc.) paymentWoodstock BRF 0151(21)9/30/2015
900.645LSTraffic Control, CrossoverAlternate traffic control designRichmond-So. Burlington IM 089-2(39)/So. Burlington-Colchester IM 089-3(60)3/19/2008
900.645LSTraffic Control, Rail-Highway CrossingEstablishing and maintaining traffic control measures at a rail-highway crossingRutland-Leicester FRT11)024) & Rutland-Burlington VTRY(5)6/10/2015
900.645LSTraffic Control, Single Lane NB Lane ShiftAlternate traffic control designRichmond-So. Burlington IM 089-2(39)/So. Burlington-Colchester IM 089-3(60)3/19/2008
900.645LSTraffic Control, Two Lane NB Lane ShiftAlternate traffic control designRichmond-So. Burlington IM 089-2(39)/So. Burlington-Colchester IM 089-3(60)3/19/2008
900.645LSTransfer to New System, Sanitary SewerTransfering service to new sanitary sewer systemRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.645LSTransfer to Temporary System, Sanitary SewerTransferring from existing to temporary sanitary sewer systemReadsboro BRO 1441(25)1/27/2010
900.645LSTrenchless PipeFurnishing and installing pipe culvert utilizing trenchless construction (see also 900.640)Barre City FEGC F 026-1(34)C/24/6/2011
900.645LSVehicle Signal Heads, LEDRemoving existing signal heads and furnishing and installing new light-emitting diode (LED) signal headsColchester-Essex STPG SGNL (45)1/28/2015
900.645LSWater Filled BarrierEPSC deviceBennington AC NH 019-1(52)2/13/2008
900.645LSWater Main on BridgeWater main on a bridgeBennington BRF 1000(16)9/3/2014
900.645LSWater Main on Bridge (w/Heat Trace pay item)Water main on a bridge w/separate heat trace pay itemHartford (Wilder) STP 1444(35)7/14/2010
900.645LSWater Trough and StairsConstructing artistic enhancement in village areaDanville FEGC 028-3(32)2/23/2011
900.645LSWaterline, MunicipalInstalling and testing a municipal waterlineNon-participatingBarre City BHF 6000(15)S2/25/2009
900.645LSWire Mesh Slope Stabilization SystemFurnishing, installing, and testing a mesh-faced slope stabilization systemHighgate STP 0297(8)7/11/2012
900.65LUPre-AssemblyFurnish all materials, tools, and labor necessary for pre-assembly of the steel plate girders and precast concrete deck panels prior to the road closure portion of the projectWaitsfield BRF 013-4(39)9/16/2015
900.65LUPrecast MockupManufacturing and transporting two (2) precast concrete mockups for performing a trial batch palcement of Ultra High Performance Concrete (UHPC)Waitsfield BRF 013-4(39)9/16/2015
900.650LUEmission Control Device, (Various)Retrofitting diesel-powered equipment used on projectN.A.B.I.Springfield STP ST CULV(5)5/23/2007
900.650LUEnd-to-End Fiber Optic Acceptance TestConducting fiber optic acceptance testingHartford-Sharon FITS(503)10/20/2010
900.650LUErosion Prevention and Sediment Control MeasuresAlternate EPSC protocol for non-jurisdictional and low risk projectsN.A.B.I. - To be used under Agency conditional approval onlyBraintree BRO 1444(36)1/27/2010
900.650LUHartford Rest AreasConstructing new infrastructure with new and existing conduits for fiber optic projectHartford-Sharon FITS(503)10/20/2010
900.650LUIncentive/DisincentiveFor payment of monies under contract incentive/disincentive clauseN.A.B.I.Woodstock BRF 0151(21)9/30/2015
900.650LULocal Roadway MaintenanceMaintaining the pre-closure conditions along the detour routeWaitsfield BRF 013-4(39)9/16/2015
900.650LUMaintenance of EPSC PlanAlternate EPSC protocol for non-jurisdictional and low risk projectsN.A.B.I. - To be used under Agency conditional approval onlyBraintree BRO 1444(36)1/27/2010
900.650LUMaintenance of Railroad TrafficMaintaining and coordinating railroad traffic when working within RR right-of-wayN.A.B.I.East Wallingford REW4140A9/16/2015
900.650LUMat Density Pay Adjustment, Bridge Deck ResurfacingPay adjustment for compaction for small quantity pavement mix on bridge deck(s)Used to differentiate bridge deck pavement from mainline pavement alternatesBerlin-Waterbury IM SURF(20)/Montpelier IM MEMB(23)6/23/2010
900.650LUMat Density Pay Adjustment, Small QuantityPay adjustment for compaction for small quantity pavement mixN.A.B.I.Woodstock BRF 0151(21)9/30/2015
900.650LUMixture Pay AdjustmentPay adjustment for small quantity pavement mixN.A.B.I.Woodstock BRF 0151(21)9/30/2015
900.650LUMixture Pay Adjustment, Bridge Deck ResurfacingPay adjustment for small quantity pavement mix on bridge deck(s)Used to differentiate bridge deck pavement from mainline pavement alternatesBerlin-Waterbury IM SURF(20)/Montpelier IM MEMB(23)6/23/2010
900.650LUOn-Site Masonry Mock-Up and Training, Jahn Permeable Mortar SystemProviding on-site masonry mock-up and training for repairing stone masonryUsed under Category II Experimental Work Plan; N.A.B.I.Woodstock BHO 1444(52)8/8/2012
900.650LURail-Highway Crossing Active Warning System, Test Train AllowanceTest for new signal system for reconstructed rail-highway crossingN.A.B.I.Vernon-Brattleboro AC STP 2126(1)S6/27/2007
900.650LUTest Train AllowanceUtilizing a test train to verify warning time at a highway grade crossingN.A.B.I.Bradford STP 2917(1)/2918(1)9/12/2012
900.670SFWire Mesh Slope Stabilization SystemFurnishing, installing, and testing a mesh-faced slope stabilization systemHighgate STP 0297(8)(Re-advertised)2/6/2013
900.670 900.675SF, SMAnti-Icing Polymer Surface Overlay, Cargill Safelane HDXFurnishing and installing anti-icing surface overlayUsed under Category II Experimental Work PlanHyde Park HES 030-2(23)1/5/2011
900.670 900.675SF, SMBlast Cleaning Existing Detectable Warning SurfaceBlast cleaning existing detectable warning surface(s)Statewide STP RAMP(1)1/20/2010
900.670 900.675SF, SMConcrete Paver StripInstalling concrete paver stripsStatewide STP SDWK(11)10/16/2013
900.670 900.675SF, SMConcrete Retaining WallDesigning, furnishing, and installing a concrete retaining wallWardsboro BHF 0114(5)12/16/2009
900.670 900.675SF, SMCulvert-End Safety GrateFurnishing and installing culvert-end safety grateBrandon NH 019-3(495)9/23/2009
900.670 900.675SF, SMElastomeric Polyurethane Pipe CoatingFurnishing and applying spray-on coating to repaired existing reinforced concrete pipeBrandon NH 019-3(495)9/23/2009
900.670 900.675SF, SMFRP Mechanically Stabilized Earth Arch HeadwallsDesigning, detailing, manufacturing, transporting, erecting, and monitoring Mechanically Stabilized Earth (MSE) arch headwalls"Bridge in a Backpack"Fairfield BRO 1448(38)11/20/2013
900.670 900.675SF, SMHalf-Filled Grid DeckFurnishing and installing half-filled grid deckingHartford (Wilder) STP 1444(35)7/14/2010
900.670 900.675SF, SMHybrid Rock Fall Barrier/Drape System, Drape ComponentFurnishing and installing protection system for ledge removal operationsUsed under Category II Experimental Work PlanHartford-Newbury IM 091-2(72)8/12/2009
900.670 900.675SF, SMInstall Detectable Warning SurfaceInstalling detecable warning surface(s) provided by the AgencyBurlington-South Burlington NH 2624(1)3/7/2012
900.670 900.675SF, SMInstallation of Grid DeckInstallation of pre-purchased grid decking materialUsed as a Final Pay Quantity (FPQ) itemNorth Hero-Grand Isle BHF 028-1(21)10/24/2007
900.670 900.675SF, SMMechanically Stabilized Earth Retaining Wall, ReConDesigning, fabricating, furnishing, erecting, and monitoring mechanically stabilized earth (MSE) wall(s)Proprietary wall system designations used under Category II Experimental Work PlanMorristown STP F 029-1(2)C/15/23/2012
900.670 900.675SF, SMNail Laminated Timber Deck PanelDetailing, furnishing, and installing nail laminated timber deck panels for floating bridgeBrookfield BRF FLBR(2)1/8/2014
900.670 900.675SF, SMPermanent FRP Sheet PilingFurnishing and installing fiber reinforced polymer (FRP) sheet pilingRandolph CMG PARK(21)S8/22/2007
900.670 900.675SF, SMPermeable Paver Tree WellFurnishing and installing concrete unit pavers (permeable and standard) surrounding existing and proposed treesStatewide STP SDWK(11)10/16/2013
900.670 900.675SF, SM, SYPrecast Concrete Gravity Retaining WallDesigning, furnishing, and erecting a precast concrete gravity retaining wallWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.670 900.675SF, SM, SYPrecast Concrete Gravity Retaining Wall with FenceDesigning, furnishing, and erecting a precast concrete gravity retaining wall with chain-link fenceMilton STP 5800(2)3/23/2011
900.670 900.675SF, SMPrecast Precompressed Concrete/Steel Composite SuperstructureManufacturing, transporting, and erecting composite concrete/steel superstructureRipton FH 010-1(42)11/12/2009
900.670 900.675SF, SMPrecast Prestressed Concrete Deck PanelManufacturing, transporting, and installing precast prestressed concrete deck panelsHyde Park STP CULV(26)12/11/2003
900.670 900.675SF, SMRemove and Reset Brick CrosswalkRemoving and resetting existing brick crosswalkBurlington-South Burlington NH 2624(1)3/7/2012
900.670 900.675SF, SMRemove and Reset Brick PaversRemoving and resetting brick paversStatewide STP SDWK(11)10/16/2013
900.670 900.675SF, SMRemove and Reset Concrete PaversRemoving and resetting concrete paversPeru STP SCRP (4)1/21/2015
900.670 900.675SF, SMRetaining WallDesigning, fabricating, furnishing, and erecting a retaining wallStowe BRF 0235(15)6/3/2015
900.670 900.675SF, SMRunway and Taxiway PaintingPerforming runway and taxiway paintingAirport projectsHighgate AIR 04-31832/6/2008
900.670 900.675SF, SMSurface Preparation for OverlayPreparing bridge deck for new overlay systemWaterford IM MEMB(31)5/9/2012
900.670 900.675SF, SMTemporary Retaining WallDesigning, constructing, and removing temporary retaining wall(s)Montgomery BHO 1448(23)8/20/2008
900.670 900.675SF, SMTemporary Steel Sheet PilingDesigning, furnishing, and installing temporary steel sheet pilingFor modifying method of measurement to exposed faceStockbridge BRF 022-1(20)5/12/2010
900.675SM, SYAsphalt-Rubber Surface Treatment with Aggregate CoverAlternate surface treatmentWaterbury IM 089-2(43)(Re-advertised)6/18/2014
900.675SM, SYBiaxial Geogrid for Roadway ConstructionGeosynthetic for roadway constructionSpecialty item as per Subsection 108.01(c) of Standard SpecificationsRichmond-So. Burlington IM 089-2(39)/So. Burlington-Colchester IM 089-3(60)3/19/2008
900.675SM, SYBridge Deck Overlay System, Poly-Carb FlexogridFurnishing and installing bridge deck overlay systemUsed under Category II Experimental Work PlanWaterford IM MEMB(31)5/9/2012
900.675SM, SYBridge Pothole RepairRepairing pot holes in bridge deck(s)Middlesex-Waterbury ST IM 089-2(42)7/23/2008
900.675SM, SYCellular Confinement System, Bridge ApproachFurnishing and installing cellular confinement system in railroad bridge approachesMiddlebury WCRS(9)6/24/2015
900.675SM, SYCobblestone PaversFurnishing and placing granite cobblestone pavementBarre City FEGC F 026-1(34)C/24/6/2011
900.675SM, SYCold Mixed Recycled Bituminous Pavement, Portland CementCold mixed recycled bituminous pavement with Portland cement additiveBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.675SM, SYCold Planing Bituminous PavementRemoving and disposing of extra depth road pavementBolton-Waterbury STP 2709(1)5/15/2013
900.675SM, SYCold Planing Bituminous Pavement for Superelevation CorrectionRemoving and disposing of road pavement for correcting roadway superelevationSt. Johnsbury-Lyndon IM 091-3(50)12/11/2013
900.675SM, SYFlagstone PaversFurnishing and placing flagstone paversAddison STP 032-1(18)8/15/2012
900.675SM, SYGeomembrane LinerFurnishing and installing a geomembrane linerHighgate STP 0297(8)(Re-advertised)2/6/2013
900.675SM, SYGeosynthetic for Ditch Lining, GeocompositeGeosynthetic for ditch liningSpecialty item as per Subsection 108.01(c) of Standard SpecificationsRichmond-So. Burlington IM 089-2(39)/So. Burlington-Colchester IM 089-3(60)3/19/2008
900.675SM, SYGeosynthetic for Ditch Lining, GeomembraneGeosynthetic for ditch liningSpecialty item as per Subsection 108.01(c) of Standard SpecificationsBennington AC NH 019-1(54)3/24/2010
900.675SM, SYGranite Rubble Block PavementFurnishing and placing granite rubble block pavementBarre Town HES 026-1(38)2/20/2008
900.675SM, SYHand-Placed Bituminous Concrete Material, DrivesPlacing bituminous material with non-mechanical meansWaitsfield BRF 013-4(39)9/16/2015
900.675SM, SYHot-In-Place RecycleRecycling hot mix asphalt (HMA) in-place for re-use on the roadwayBerlin-Barre City NH SURF(44)/Berlin-Montpelier IM SURF(45)/Hartford-Sharon IM SURF(46)6/18/2014
900.675SM, SYImprinted Concrete Sidewalk, 5 InchFurnishing and installing imprinted concrete sidewalkBristol HES 021-1(28)(Re-Advertised)7/23/2014
900.675SM, SYImprinted/Colorized SurfaceAlternate (imprinted) surface markingWoodstock NH 2606(1)S/STP 2509(1)S1/9/2008
900.675SM, SYInstall Geotextile for Silt FenceInstalling Agency-furnished geotextile materialCambridge STP 0235(9)8/19/2009
900.675SM, SYInstall Geotextile Under Stone FillInstalling Agency-furnished geotextile materialCambridge STP 0235(9)8/19/2009
900.675SM, SYLandscape FabricFurnishing and placing landscape fabric on shrub planting beds and hydric soil stockpilesCabot-Danville FEGC F 028-3(26) C/112/15/2010
900.675SM, SYMembrane Waterproofing, Spray AppliedFurnishing and installing a spray applied membrane waterproofing system on bridge deckUsed under Category II Experimental Work PlanHancock ER BRF 0174(16)8/22/2012
900.675SM, SYMicro-milling Bituminous Concrete PavementMicro-milling of existing asphaltic pavement to remove irregularitiesBethel-Brookfield IM SURF (54)2/25/2015
900.675SM, SYPainted Bike LaneFurnishing and placing painted bike lane pavement markingsBurlington-South Burlington NH 2624(1)3/7/2012
900.675SM, SYPaver Placed Surface Treatment, Type CAlternate surface treatmentSURF projectsBethel-Brookfield IM SURF (54)2/25/2015
900.675SM, SYPond Liner, GeomembraneFurnishing and installing a geomembrane linerBarre City FEGC F 026-1(34)C/24/6/2011
900.675SM, SYPorous Portland Cement Concrete PavementAlternate porous pavement structureUsed under Category II Experimental Work PlanRandolph CMG PARK(21)S8/22/2007
900.675SM, SYPortland Cement Concrete Island TreatmentSurface treatment on raised traffic islandHyde Park HES 030-2(34)6/3/2015
900.675SM, SYPortland Cement Reinforced Concrete Sidewalk, 5 InchConstructing reinforced concrete sidewalk and curb rampsBarre City FEGC F 026-1(34)C/24/6/2011
900.675SM, SYPortland Cement Reinforced Concrete Sidewalk, 8 InchConstructing reinforced concrete sidewalk and curb rampsBarre City FEGC F 026-1(34)C/24/6/2011
900.675SM, SYPrecast Concrete Geogrid Retaining WallFurnishing and installing a precast concrete geogrid retaining wallBrandon NH 019-3(495)9/23/2009
900.675SM, SYPrecast Concrete WingwallFabricating, furnishing, and erecting precast concrete wingwall(s)New Haven WCRS(18)5/14/2014
900.675SM, SYPrecast Concrete/Steel Composite SuperstructureManufacturing, transporting, and erecting prefabricated composite concrete/steel superstructure unitsRoxbury BHF 0187(8)/ER 0187(9)9/23/2011
900.675SM, SYPrefabricated Bridge Unit SuperstructureManufacturing, transporting, and erecting concrete/steel composite prefabricated bridge units (PBU's)Warren BRF 013-4(32)10/16/2013
900.675SM, SYRailroad Bridge Waterproofing SystemFurnishing and applying railroad bridge deck waterproofing systemNew Haven WCRS(18)5/14/2014
900.675SM, SYReclaimed Stabilized BaseReclaimed stabilized base courseBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.675SM, SYReclaimed Stabilized Base, Calcium ChlorideReclaimed stabilized base course with calcium chloride stabilizing agentWestfield-Troy STP 2903(1)6/10/2015
900.675SM, SYReclaimed Stabilized Base, Portland CementReclaimed stabilized base course with portland cement stabilizing agentBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.675SM, SYReinforced Soil SlopeReinforced (geogrid) soil slopeRoyalton BRS 0147(13)10/30/2013
900.675SM, SYRemoval and Disposal of Asphaltic AsbestosRemoving and disposing of asphaltic asbestosStowe BHO 1446(30)2/17/2010
900.675SM, SYRepointing Masonry with Dry Pack GroutRepointing of the stone masonry culvert using a pre-bagged non shrink grout specifically formulated for dry packMount Holly/Ferrisburgh STRB 1501/STRB 15028/12/2015
900.675SM, SYScarifying PavementScarifying or breaking up pavement to be left in place below subgradeCambridge BRF 027-1(4)/STP 030-2(27)6/27/2012
900.675SM, SYStamped Colored Concrete Apron, 200 mm (8 Inch)Furnishing and installing stamped concrete apron(s)Hyde Park HES 030-2(34)6/3/2015
900.675SM, SYStamped Colored Concrete Median Island, 125 mm (5 Inch)Furnishing and installing stamped concrete median island(s)Richmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.675SM, SYStamped Colored Concrete Traffic Circle, 200 mm (8 Inch)Furnishing and installing stamped concrete traffic circle(s)Richmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.675SM, SYStamped ConcreteFurnishing and installing stamped concreteStatewide STP SDWK(11)10/16/2013
900.675SM, SYStamped Concrete Island, 200 mm (8 Inch)Furnishing and installing a stamped concrete islandMorristown STP F 029-1(2)3/13/2013
900.675SM, SYSteel Grid FlooringDesigning, fabricating, transporting, and installing steel grid flooringDummerston BHO 1442(28)4/29/2009
900.675SM, SYThin Polymer OverlayFurnishing and applying a thin polymer overlayJericho STP FTBR(3)5/7/2014
900.675SM, SYTraffic Island, Granite Cobble BlocksAlternate traffic island designWoodstock NH 2606(1)S/STP 2509(1)S1/9/2008
900.675SM, SYUnit Block Retaining WallConstructing a concrete unit block retaining wallRichmond STP 0284(17)/Richmond CMG PARK(31)5/29/2013
900.680T, TON6.3 MM Polymer-Modified Bituminous Concrete PavementAlternate surface treatmentSURF projectsRandolph-Roxbury ER STP 0187(11)12/17/2014
900.680T, TON9.5 MM SBS Polymer-Modified Bituminous Concrete PavementAlternate surface treatmentSURF projectsDorset-Danby NH SURF(24)4/6/2011
900.680T, TONAggregate to Meet Cold Mixed GradationFurnishing aggregate to meet gradation requirements for cold mixed recycled bituminous pavementBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.680T, TONBallasted Track Construction for Turnouts and Grade CrossingsFurnishing and installing materials for ballasted track constructionProctor-Middlebury STP WCRS(7)5/5/2010
900.680T, TONBituminous Concrete Pavement Surface Preparation, Type I, IIPerforming surface preparation prior to placing final surface treatmentGranville ER STP 013-4(40)7/15/2015
900.680T, TONBituminous Concrete Pavement, Bridge Deck ResurfacingPavement specification for small quantity pavement mix on bridge deck(s)Used to differentiate bridge deck pavement from mainline pavement alternatesBerlin-Waterbury IM SURF(20)/Montpelier IM MEMB(23)6/23/2010
900.680T, TONBituminous Concrete Pavement, Small QuantityPavement specification for small quantity mix projectsWoodstock BRF 0151(21)9/30/2015
900.680T, TONFurnish and Place Ballast Surfacing CourseFurnishing and placing stone ballast for the raising and surfacing of track components and crossingRutland-Burlington VTRY(1) C17/10/2013
900.680T, TONMaterial Transfer VehicleFurnishing and utilizing an approved material transfer device for paving operationsGranville ER STP 013-4(40)7/15/2015
900.680T, TONMaterial Transfer Vehicle, Cold MixFurnishing and utilizing an approved material transfer device for paving operationsBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.680T, TONMicrosurface Treatment, Type IIAlternate surface treatmentSURF projectsGeorgia-St. Albans IM SURF(21)8/18/2010
900.680T, TONMicrosurface Treatment, Type IIIAlternate surface treatmentGeorgia-St. Albans IM SURF(21)8/18/2010
900.680T, TONPorous Bituminous Concrete PavementAlternate porous pavement structureUsed under Category II Experimental Work PlanRandolph CMG PARK(21)S8/22/2007
900.680T, TONPortland Cement for Base StabilizationPortland cement for reclaimed base stabilizationBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.680T, TONPortland Cement for Cold Mixed RecyclingPortland cement for cold mixed recyclingBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.680T, TONRailroad BallastFurnishing and installing railroad ballast (see also 900.608)Rutland-Burlington VTRY(3)5/21/2014
900.680T, TONRailroad Ballast, Base CourseFurishing and installing railroad ballast for base courseRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.680T, TONRailroad Ballast, Surface CourseFurishing and installing railroad ballast for surface courseRutland City-Proctor STP 2728(1)/Rutland City NH 2716(1)/STP 019-3(57)8/14/2013
900.680T, TONRSB Supplemental Aggregate MaterialMaterial used for correcting roadway elevations in reclaimed stabilized base projectsBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.680T, TONSubbase of Crushed Gravel, Fine Graded for ReclaimingFor improving gradation deficiencies and/or to correct superelevationPavement reclaiming projectsJohnson-Hyde Park STP 2215(1)S12/12/2007
900.680T, TONSubbase, RAP for ReclaimingUsing RAP material for constructing reclaimed stabilized baseWestford-Fairfax AC STP 2804(1)3/24/2010
900.680T, TONTire Shreds, Type BTire shreds for use as structural  abutment backfillCabot BRO 1446(27)1/9/2008
900.680T, TONTransportation and Disposal of Contaminated SoilsLoading and transporting contaminated soils to a licensed disposal facilityBennington NH 019-1(55)4/23/2008
900.680T, TONWarm-Mix Asphalt, Foaming ProcessConstructing one or more courses of Warm-Mix Asphalt (WMA) on a prepared surfaceCastleton-West Rutland AC STP 2705(1)/Castleton AC STP 2908(1)/AC STP 2909(1)9/28/2011
900.680T, TONWarm-Mix Asphalt, Organic Wax AdditiveConstructing one or more courses of Warm-Mix Asphalt (WMA) on a prepared surfaceCastleton-West Rutland AC STP 2705(1)/Castleton AC STP 2908(1)/AC STP 2909(1)9/28/2011
900.683CWTEmulsified AsphaltFurnishing and applying bituminous treatment on an approved surfaceWoodstock BRF 0151(21)9/30/2015
900.683CWTEmulsified Asphalt, Cold Mix with CementBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015
900.683CWTFog Seal Surface TreatmentBerlin STP 2935(1), Berlin NH STP 2938(1), & Berlin NH STP 2937(1)6/17/2015